My WebLink
|
Help
|
About
|
Sign Out
Home
Comprehensive Plan Update
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1995 (Approved)
>
1994 Land Use Study
>
Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 11:57:33 AM
Creation date
8/18/2014 12:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The west bridge approach corridor can be aligned "to become the extension of C.R. #116 without <br />creating a "T" intersection. This is most efficient, and it will allow traffic to flow into Ramsey's <br />industrial area unimpeded. <br />There is substantial opposition to the east bridge in Dayton. Although officially undecided, Dayton <br />is investigating other alternatives and has withdrawn its support for the east bridge location. The <br />west bridge location proposed by the Planning Commission supports all road alignments being <br />considered by Dayton. <br />If County Road #116 is extended to Highway #10, including a grade -separated intersection, the <br />east alternative will require an additional interchange. Cyrus Knutson, MnDOT, estimated the cost <br />of the east interchange to be $2,000,000 to $6,000,000. <br />Planning Commission Memo to Council/January 13, 1995 <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.