My WebLink
|
Help
|
About
|
Sign Out
Home
Comprehensive Plan Update
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1995 (Approved)
>
1994 Land Use Study
>
Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 11:57:33 AM
Creation date
8/18/2014 12:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 3, 1995 <br />To: Planning Commission <br />From: Terry Hendriksen <br />Subject: Draft of Transportation Plan Update <br />The City Council asked us to update the Transportation Plan. Our recommendation is <br />complete, however, the location selected for the Mississippi River bridge is controversial <br />and the Economic Development Commission has developed an alternative plan. <br />This memo will focus on three things, benefits of the Planning Commission alternative, <br />shortcomings of the EDC plan, and errors in the December 12, 1994 report from Jim <br />Gromberg, Economic Development Coordinator. <br />1. i3ENEFITS OF THE PLANNING COMMISSION ALTERNATIVE <br />Planning Commission concluded that although a Mississippi River bridge is a very <br />significant element of our Transportation Plan we must develop a "Transportation <br />Skeleton" that will support both bridge locations. The "Transportation Skeleton" should <br />exhibit good planning, even if a bridge is not built. <br />Transportation Skeleton <br />Industrial Boulevard (CR 116) is scheduled for extension to Armstrong boulevard. <br />Ramsey is meeting with Anoka County to determine the desired extension of 116 beyond <br />Armstrong. <br />The Planning commission recommended extending 116 West, beyond Armstrong, to <br />Highway 10. A grade separated intersection is desirable. This improves Ramsey's <br />commercial/industrial development potential, provides an East/West collector through <br />our industrial area and would be an attractive alternative for some highway 10 traffic. <br />West Bridge <br />A new Mississippi bridge will generate significant traffic volume. The intersection of the <br />bridge approach and Highway 10 can be a prime retail/commercial location if space is <br />available. Property surrounding the West bridge corridor is currently undeveloped. <br />Hundreds of acres outside the critical rivers boundary are available for development with <br />the West alternative. <br />Because the West alternative is undeveloped land, there is no impact on current <br />residential use. Enough property exists to allow development of the bridge approach <br />corridor, commercial retail uses and "mixed use" residential for buffering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.