Laserfiche WebLink
Figure 3-2 2030 Metropolitan Regional Parks System Plan <br />Based on Plan Adopted in 2005 <br />Open to th, <br />1F S7J d1Yai c - u: <br />oo <br />ca. <br />0 <br />Et <br />MRT - Ramsey's N▪ ational and Regional Extension <br />C <br />9G <br />2 <br />R <br />2 <br />47 <br />} <br />O <br />a <br />0 <br />z <br />0- <br />,r7 <br />C <br />so <br />Y <br />rr <br />L <br />03 <br />• 03 <br />CL <br />Recognition of Regional Siatus <br />Completing the System <br />Recognition el Re <br />System Changes iUpdared In 2010) <br />Regional Trail Search Corridor <br />Special Recreation Feature Addition <br />Regional Park Study Aria <br />Appendix 2, Page 2 <br />Metropolitan Council 2030 Regional Parks Policy Plan <br />