Laserfiche WebLink
Project Elements and Estimate of Construction Costs <br />Fill out the scoping sheet below or attach the worksheet Appendix U and provide the cost <br />estimate for each element. You may add additional eligible costs (construction costs) that are not <br />accounted for in the blank spaces at the bottom of the table. Applicants may instead use the more <br />exhaustive checklist of the Mn/DOT scoping sheet in lieu of this checklist. The total cost should <br />match the total cost reported for the project. Please use 2011 cost estimates, the TAB may apply <br />an inflation factor to awarded projects. <br />CONSTRUCTION PROJECT ELEMENTS/COST ESTIMATES <br />Check all that ITEM <br />apply <br />®❑❑❑®®❑❑❑❑❑❑®❑®❑®®®®❑❑❑®❑❑❑®® <br />COST <br />Mobilization (approx. 5% of total cost) $72,845 <br />Removals (approx. 5% of total cost) $72,845 <br />Roadway (grading, borrow, etc.) $ <br />Roadway (aggregates and paving) $ <br />Subgrade Correction (muck) $ <br />Storm Sewer $58,650 <br />Ponds $ <br />Concrete Items (curb & gutter, sidewalks, median $ <br />barriers) <br />Pedestrian Curb Ramps (ADA) $ <br />Path/Trail Construction $763,180 <br />Traffic Control $19,000 <br />Striping $4,000 <br />Signing $3,650 <br />Lighting $ <br />Turf - Erosion & Landscaping $103,340 <br />Bridge $ <br />Retaining Walls $104,400 <br />Noise Wall $ <br />Traffic Signals $ <br />Wetland Mitigation $ <br />Other Natural and Cultural Resource Protection $ <br />RR Crossing $ <br />$ <br />Trail Signage: Wayfinding/Interpretive $20,000 <br />Trail Amenities (bumpout, bench, etc.) $45,000 <br />$ <br />$ <br />$ <br />Contingencies $190,000 <br />TOTAL CONSTRUCTION COST $1,456,910 <br />