My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/22/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 07/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:21:42 PM
Creation date
8/22/2014 3:37:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />§ 3.4.4 The Architect shall update the estimate for the Cost of the Work. <br />§ 3.4.5 The Architect shall submit the Construction Documents to the Owner, advise the Owner of any adjustments to <br />the estimate of the Cost of the Work, take any action required under Section 6.5, and request the Owner's approval. <br />§ 3.5 BIDDING OR NEGOTIATION PHASE SERVICES <br />§ 3.5.1 GENERAL <br />The Architect shall assist the Owner in establishing a list of prospective contractors. Following the Owner's approval <br />of the Construction Documents, the Architect shall assist the Owner in (1) obtaining either competitive bids or <br />negotiated proposals; (2) confirming responsiveness of bids or proposals; (3) determining the successful bid or <br />proposal, if any; and, (4) awarding and preparing contracts for construction. <br />§ 3.5.2 COMPETITIVE BIDDING <br />§ 3.5.2.1 Bidding Documents shall consist of bidding requirements and proposed Contract Documents. <br />§ 3.5.2.2 The Architect shall assist the Owner in bidding the Project by <br />.1 procuring the reproduction of Bidding Documents for distribution to prospective bidders; <br />.2 distributing the Bidding Documents to prospective bidders, requesting their return upon completion of <br />the bidding process, and maintaining a log of distribution and retrieval and of the amounts of deposits, <br />if any, received from and returned to prospective bidders; <br />.3 organizing and conducting a pre -bid conference for prospective bidders; <br />.4 preparing responses to questions from prospective bidders and providing clarifications and <br />interpretations of the Bidding Documents to all prospective bidders in the form of addenda; and <br />.5 organizing and conducting the opening of the bids, and subsequently documenting and distributing the <br />bidding results, as directed by the Owner. <br />§ 3.5.2.3 The Architect shall consider requests for substitutions, if the Bidding Documents permit substitutions, and <br />shall prepare and distribute addenda identifying approved substitutions to all prospective bidders. <br />§ 3.5.3 NEGOTIATED PROPOSALS <br />§ 3.5.3.1 Proposal Documents shall consist of proposal requirements and proposed Contract Documents. <br />§ 3.5.3.2 The Architect shall assist the Owner in obtaining proposals by <br />.1 procuring the reproduction of Proposal Documents for distribution to prospective contractors, and <br />requesting their return upon completion of the negotiation process; <br />.2 organizing and participating in selection interviews with prospective contractors; and <br />.3 participating in negotiations with prospective contractors, and subsequently preparing a summary <br />report of the negotiation results, as directed by the Owner. <br />§ 3.5.3.3 The Architect shall consider requests for substitutions, if the Proposal Documents permit substitutions, and <br />shall prepare and distribute addenda identifying approved substitutions to all prospective contractors. <br />§ 3.6 CONSTRUCTION PHASE SERVICES <br />§ 3.6.1 GENERAL <br />§ 3.6.1.1 The. Architect shall provide administration of the Contract between the Owner and the Contractor as set forth <br />below and in AIA Document A20111"-2007, General Conditions of the Contract for Construction. If the Owner and <br />Contractor modify AIA Document A201-2007, those modifications shall not affect the Architect's services under this <br />Agreement unless the Owner and the Architect amend this Agreement. <br />§ 3.6.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services. The Architect <br />shall have authority to act on behalf of the Owner only to the extent provided in this Agreement. The Architect shall <br />not have control over, charge of, or responsibility for the construction means, methods, techniques, sequences or <br />procedures, or for safety precautions and programs in connection with the Work, nor shall the Architect be responsible <br />for the Contractor's failure to perform the Work in accordance with the requirements of the Contract Documents. The <br />Architect shall be responsible for the Architect's negligent acts or omissions, but shall not have control over or charge <br />AIA Document B101 M - 2007 (formerly B161 TH-1997). Copyright @ 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />reserved. WARNING: This AIA0 Document Is protected by U.S. Copyright Law and International Treaties. unauthorized reproduction or distribution of <br />this AIAV Document, or any portion of it, may result in severe civil and criminal penalties, and wit be prosecuted to the maximum extent possible under <br />the law. This document was produced by AIA software at 13:53:35 on 07/14/2014 under Order No.7301285732_1 which expires an 0611412015, and is not for <br />resale. <br />User Notes: (1347177842) <br />
The URL can be used to link to this page
Your browser does not support the video tag.