Init.
<br />§ 4.2 Insert a description of each Additional Service designated in Section 4.1 as the Architect's responsibility, if not
<br />further described in an exhibit attached to this document.
<br />§ 4.3 Additional Services may be provided after execution of this Agreement, without invalidating the Agreement.
<br />Except for services required due to the fault of the Architect, any Additional Services provided in accordance with this
<br />Section 4.3 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in the
<br />Architect's schedule.
<br />§ 4.3.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner
<br />with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not
<br />proceed to provide the following services until the Architect receives the Owner's written authorization:
<br />.1 Services necessitated by a change in the Initial Information, previous instructions or approvals given by
<br />the Owner, or a material change in the Project including, but not limited to, size, quality, complexity,
<br />the Owner's schedule or budget for Cost of the Work, or procurement or delivery method;
<br />,2 Services necessitated by the Owner's request for extensive environmentally responsible design
<br />alternatives, such as unique system designs, in-depth material research, energy modeling, or LEEDD
<br />certification;
<br />.3 Changing or editing previously prepared instruments of Service necessitated by the enactment or
<br />revision of codes, laws or regulations or official interpretations;
<br />.4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of
<br />performance on the part of the Owner or the Owner's consultants or contractors;
<br />.5 Preparing digital data for transmission to the Owner's consultants and contractors, or to other Owner
<br />authorized recipients;
<br />.6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner;
<br />.7 Preparation for, and attendance at, a public presentation, meeting or hearing;
<br />.8 Preparation for, and attendance at a dispute resolution proceeding or legal proceeding, except where the
<br />Architect is party thereto;
<br />.9 Evaluation of the qualifications of bidders or persons providing proposals;
<br />.10 Consultation concern ing replacement of Work resulting from fire or other cause during construction; or
<br />.11 Assistance to the Initial Decision Maker, if other than the Architect.
<br />§ 4.3.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, notify
<br />the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need. If the Owner
<br />subsequently determines that all or parts of those services are not required, the Owner shall give prompt written notice
<br />to the Architect, and the Owner shall have no further obligation to compensate the Architect for those services:
<br />.1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the
<br />Architect;
<br />.2 Responding to the Contractor's requests for information that are not prepared in accordance with the
<br />Contract Documents or where such information is available to the Contractor from a careful study and
<br />comparison of the Contract Documents, field conditions, other Owner -provided information,
<br />Contractor -prepared coordination drawings, or prior Project correspondence or documentation;
<br />.3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's
<br />proposals and supporting data, or the preparation or revision of Instruments of Service;
<br />.4 Evaluating an extensive number of Claims as the Initial Decision Maker;
<br />.5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to
<br />Instruments of Service resulting therefrom; or
<br />.6 To the extent the Architect's Basic Services are affected, providing Construction Phase Services 60
<br />days after (1) the date of Substantial Completion of the Work or (2) the anticipated date of Substantial
<br />Completion identified in Initial Information, whichever is earlier.
<br />§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional
<br />Services. When the limits below are reached, the Architect shall notify the Owner:
<br />.1 Two ( 2 ) reviews of each Shop Drawing, Product Data item, sample and similar submittal of the
<br />Contractor
<br />AIA Document B101 TM - 2007 (formerly B151 TN — 1997). Copyright 01974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights
<br />reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of
<br />this AIM' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under
<br />the taw. This document was produced by AIA software at 13.53.35 on 07/14/2014 under Order No.7301285732__1 which expires on 06/1412015, and is not for
<br />resale.
<br />User Notes: (1347177844
<br />
|