My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/22/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 07/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:21:42 PM
Creation date
8/22/2014 3:37:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />§ 5.10 Except as otherwise provided in this Agreement, or when direct communications have been specially <br />authorized, the Owner shall endeavor to communicate with the Contractor and the Architect's consultants through the <br />Architect about matters arising out of or relating to the Contract Documents. The Owner shall promptly notify the <br />Architect of any direct communications that may affect the Architect's services. <br />§ 5.11 Before executing the Contract for Construction, the Owner shall coordinate the Architect's duties and <br />responsibilities set forth in the Contract for Construction with the Architect's services set forth in this Agreement. The <br />Owner shall provide the Architect a copy of the executed agreement between the Owner and Contractor, including the <br />General Conditions of the Contract for Construction. <br />§ 5.12 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall <br />obligate the Contractor to provide the Architect access to the Work wherever it is in preparation or progress. <br />ARTICLE 6 COST OF THE WORK <br />§ 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all <br />elements of the Project designed or specified by the Architect and shall include contractors' general conditions costs, <br />overhead and profit. The Cost of the Work does not include the compensation of the Architect, the costs of the land, <br />rights -of -way, financing, contingencies for changes in the Work or other costs that are the responsibility ofthe Owner. <br />§ 6.2 The Owner's budget for the Cost of the Work is provided in Initial Information, and may be adjusted throughout <br />the Project as required under Sections 5.2, 6.4 and 6.5. Evaluations of the Owner's budget for the Cost of the Work, the <br />preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared by the Architect, <br />represent the Architect's judgment as a design professional. It is recognized, however, that neither the Architect nor <br />the Owner has control over the cost of labor, materials or equipment; the Contractor's methods of determining bid <br />prices; or competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and does not <br />warrant or represent that bids or negotiated prices will not vary from the Owner's budget for the Cost of the Work or <br />from any estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect. <br />§ 6.3 hi preparing estimates ofthe Cost of Work, the Architect shall be permitted to include contingencies for design, <br />bidding and price escalation; to determine what materials, equipment, component systems and types of construction <br />are to be included in the Contract Documents; to make reasonable adjustments in the program and scope of the Project; <br />and to include in the Contract Documents alternate bids as may be necessary to adjust the estimated Cost of the Work <br />to meet the Owner's budget for the Cost of the Work. The Architect's estimate of the Cost of the Work shall be based <br />on current area, volume or similar conceptual estimating techniques. If the Owner requests detailed cost estimating <br />services, the Architect shall provide such services as an Additional Service under Article 4. <br />§ 6.4 If the Bidding or Negotiation Phase has not commenced within 90 days after the Architect submits the <br />Construction Documents to the Owner, through no fault of the Architect, the Owner's budget for the Cost ofthe Work <br />shall be adjusted to reflect changes in the general level of prices in the applicable construction market. <br />§ 6.5 If at any time the Architect's estimate of the Cost of the Work exceeds the Owner's budget for the Cost of the <br />Work, the Architect shall make appropriate recommendations to the Owner to adjust the Project's size, quality or <br />budget for the Cost of the Work, and the Owner shall cooperate with the Architect in making such adjustments. <br />§ 6.6 If the Owner's budget for the Cost of the Work at the conclusion of the Construction Documents Phase Services <br />is exceeded by the lowest bona fide bid or negotiated proposal, the Owner shall <br />.1 give written approval of an increase in the budget for the Cost of the Work; <br />.2 authorize rebidding or renegotiating of the Project within a reasonable time; <br />.3 terminate in accordance with Section 9.5; <br />.A in consultation with the Architect, revise the Project program, scope, or quality as required to reduce <br />the Cost of the Work; or <br />.5 implement any other mutually acceptable alternative. <br />§ 6.7 If the Owner chooses to proceed under Section 6.6.4, the Architect, without additional compensation, shall <br />modify the Construction Documents as necessary to comply with the Owner's budget for the Cost of the Work at the <br />conclusion of the Construction Documents Phase Services, or the budget as adjusted under Section 6.6.1. The <br />AIA Document B1011 — 2007 (Formerly B15111'- 1997). Copyright ©1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />reserved. WARNING: This AIA5 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of <br />this AIA' Document, or any portion alit may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under <br />the law. This document was produced by AIA software at 13:53:35 on 07/14/2014 under Order No.7301285732_1 which expires on 08114/2015, and is not for <br />resale. <br />User Notes: (1347177842) <br />
The URL can be used to link to this page
Your browser does not support the video tag.