My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/22/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 07/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:21:55 PM
Creation date
8/25/2014 11:02:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session 2. 4. <br />Meeting Date: 07/22/2014 <br />Information <br />Title: <br />Consider Contract for Professional Services with BKV Group to Conduct F_rx11n':,yi Ord Specifications for Fire <br />Station 1t2 This case was removed from the Agenda. <br />Purpose/Background: <br />PURPOSE: <br />The purpose of this case is to consider moving forward with the next step in the process to construct a new Fire <br />Station #2 -- Final Plans and Specifications (Design Development Stage). Below is a process outline and a staff <br />recommendation. <br />PROCESS (Background): <br />1. Space Needs Analysis - August 2006 <br />The purpose of this step is to answer a number of questions regarding the existing Fire Station #2 site; and to <br />identify Fire Department space needs. For example, does the existing site work for Fire Station #2? Can we <br />renovate the old municipal center building? Should we demolish and rebuild a new fire station? Attached is a <br />Fire Station #2 Feasibility Report and Space Needs Analysis for the old municipal center site (existing <br />location of Fire Station #2). This work was completed by BKV Group. In 2006, it was determined, utilizing <br />the existing municipal center site was not a feasible or practical long term solution. At that time, a new Fire <br />Station #2 site was identified and proposed--5650 Alpine Drive NW (just northeast of the old municipal <br />center site). <br />2.Surplus City (honed Property --Summer 2012 <br />In 2012, the City Council identified the old municipal center site surplus City owned property; and provided <br />Staff with direction to identify opportunities to return this property back to the private sector. As part of that <br />discussion, the current location of Fire Station #2 was identified as a factor in the future development of the <br />old municipal center site. In order to allow for future development of the old municipal center site, a new <br />location for Fire Station #2 would need to be planned and prepared for in order to effectively react to future <br />development. NOTE: the process to develop site plans, architectural plans, bid documents, award a bid, and <br />attain government approvals can span several months to a year. <br />3.Preliminary Design Stage --November 2013 ($19,000) <br />The purpose of this stage is to develop schematic designs of what Fire Station #2 could look like (often <br />referred to as concept design). The outcome of this stage is preliminary architectural designs and preliminary <br />site plan documents. Additionally, a preliminary project budget is developed. This work was authorized by <br />the Council in November 2013. Attached are results developed by BKV Group. Construction costs were <br />estimated at $3,165,000 and soft costs are estimated at $604,500 ($3,769,500 sub total). If the City bonded <br />for this project, the total bond issue would be estimated just above $4M (total estimated project costs). The <br />outcome of this process is a design the will adequately accommodate long term Fire Department needs; and <br />provide one garage stall for an Allina Health Care ambulance; and provide a satellite office and garage stall <br />for the Police Department. <br />4. Final Design & Specifications --July 2014 ($128,000) <br />The purpose of this stage is to develop final site plans, architectural plans, civil plans, landscaping plans, <br />electric/mechanical plans, construction specifications and bid documents. By completing this step, the City <br />would be in position to move forward with constructing Fire Station #2 in an a quick and effective manner. <br />Value exists in completing this step now, rather waiting for a development proposal/purchase agreement to <br />
The URL can be used to link to this page
Your browser does not support the video tag.