My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/22/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 07/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:21:55 PM
Creation date
8/25/2014 11:02:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey Fire Station No 2 Replacement Study <br />Feasibility Study <br />Ramsey, Minnesota <br />BKV Group 1272.05 <br />BKV <br />1. Disconnect the mechanical services from the city hall that serve the fire station. <br />2. Demolish the mechanical systems within the city hall unless noted to be relocated below. The systems <br />include but are not limited to the water service, gas -fired boiler heating system with backup fuel oil <br />system, air handling system including the remote mounted condensing units and exhaust fans, plumbing <br />systems serving the city hall, domestic water heaters and plumbing fixtures. <br />3. Convert a portion of the existing fire station training room or break room into a mechanical equipment <br />room. <br />4. Disconnect the under floor sanitary service from the existing system in the city hall and reroute to the <br />site sanitary main. <br />5. Relocate the water service from the onsite well and pressure tank to the fire station mechanical room. <br />6. Provide a 100 gallon, electric water heater in the fire station mechanical room for the laundry, shower <br />and lavatories, utility sink and hose reel in the truck bay. Connect into the existing piping system. <br />7. Relocate the water softener to the fire station mechanical room and reconnect to the fire station <br />plumbing system. <br />8. Provide a gas -fired, DX cooling rooftop unit to serve the occupied spaces in the fire station not including <br />the truck bay. Connect to the existing ductwork. <br />9. Provide two gas -fired modular boilers in the fire station mechanical room to serve the perimeter finned <br />tube radiation in the office areas and the horizontal unit heaters in the truck bay. <br />Electrical Report <br />If the city is to demolish the city hall portion of the building and keep the fire station portion, the following renovation <br />work is required: <br />I. Replace existing panel in northeast corner of fire station building with a new 400A 208/120V 42 space <br />panel with a service entrance rated main circuit breaker. <br />2. Remove existing feeder from city hall building to existing electrical panel. <br />3. Re -feed existing loads from old fire station panel to new panel. <br />4. Install new feeder from new panel to existing transformer on north side of existing fire station. <br />5. Provide power for new and relocated mechanical equipment from new panel. <br />6. Install new fire alarm system in fire station. <br />7. Install new telephone system in fire station. <br />Architectural Space Program Report <br />Comm. No. 1573.02 Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.