My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/22/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 07/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:21:55 PM
Creation date
8/25/2014 11:02:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey Fire Station No 2 Replacement Study <br />Feasibility Study <br />Ramsey, Minnesota <br />BKV Group 1272.05 <br />Site Assessment and Concept Site Plan <br />The Feasibility Study effort investigated the overall appropriateness of the proposed replacement fire station site <br />location. <br />The proposed site is to include the Replacement fire station as well as a proposed communications tower supporting <br />Anoka County 800 mhz dispatching communications. Information related to the communications tower requirements <br />and design criteria were based on numerous reviews with John Tonding of Anoka County and reviewed with <br />Connexus in conjunction with the adjacent Connexus power sub -station located to the East of the site. <br />Multiple site concept plans were developed to explore a range of site development concepts including fire station <br />location, site access, and communication tower locations. The site concept plans are based on preliminary building <br />concept plan options included in Appendix B of this report. The following concept site plan illustrates the <br />recommended site concept, however, further development should be required in the Schematic Design Phase of a <br />replacement fire station project. Through these preliminary site concept explorations, the design team and Fire <br />Department believe the site to be adequately sized and configured for reasonable flexibility and some future expansion <br />for additional apparatus bays. The final location of the communications tower requires final coordination and <br />agreement by Connexus, Anoka County, and the City of Ramsey, however, preliminary tower locations appear to be <br />compatible with the proposed fire station use and anticipated site configuration. <br />Architectural Space Program Report <br />Comm. No. I573.02 Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.