Laserfiche WebLink
OWNER: City of Ramsey <br />PROJ: Ramsey Fire Station 2 Replacement <br />LOC.: Ramsey, Minnesota <br />TITLE: PRELIMINARY CONCEPTUAL ESTIMATE <br />Concept Estimate - Option 3 <br />New Construction <br />acres 5 <br />DESCRIPTION <br />ADMINISTRATION <br />LEGAL, FISCAL & ADMINISTRATIVE <br />SOIL BORINGS <br />SURVEY <br />CONSTRUCTION COSTS <br />Building Demolition - Existing City Hall, Fire Station, Police S <br />Existing Site Repair (topography only, no fill) <br />✓New Site Costs <br />✓New Construction <br />FEES <br />A/E DESIGN AND BIDDING FEES <br />CIVIL ENGINEERING <br />LANDSCAPE ARCHITECTURE <br />REIMBURSABLE EXPENSES <br />PLAN REVIEW FEES & PERMITS <br />SPECIAL INSPECTIONS AND TESTING <br />FURNISHINGS, FIXTURES & EQUIPMENT (FF&E) <br />OFFICE FURNITURE ALLOWANCE* <br />KITCHEN EQUIPMENT ALLOWANCE** <br />LAUNDRY EQUIPMENT ALLOWANCE <br />FF&E DESIGN FEES <br />TECHNOLOGY <br />DATA / TELEPHONE <br />SURVEILLANCE CAMERAS / MONITORS <br />CONTINGENCY <br />ESTIMATING (5%) <br />PROJECT (10%) <br />FINANCING <br />BOND ISSUANCE COSTS <br />INVESTMENT EARNINGS <br />DATE : 31-Jul-06 <br />REV#: <br />PROJ#_: 1572 <br />FILE# <br />NEW'SC(FT <br />REMODEL SQ FT <br />AREA TO REMAIN <br />TOTAL SQ FT <br />COST/ BUILDING <br />BUILDING SF <br />$0. <br />S8,000 <br />$1,500 <br />$143,000 <br />$20,000 <br />$250,000 <br />S1,368,640 <br />$143,171 <br />$14,000 <br />$8,000 <br />$7,874 <br />$4,454 <br />$13,362 <br />$78,208 <br />$10,000 <br />$8,000 <br />$7,697 <br />$8,000 <br />$0 <br />$104,695 <br />$209,391 <br />$0 <br />$o <br />COST <br />SF <br />BKV <br />12 C7 u I' <br />9,775 <br />0 <br />0 <br />9,776 <br />SUB PERCENT <br />TOTAL TOTAL <br />9,776 $0.97 $9,500 0.39% <br />O.00% <br />0.33% <br />0.06% <br />9,776 $182.25 $1,781,640 73.99% <br />5.94% <br />0.83% <br />10.38% <br />56.84% <br />9,776 $19.52 $190,862 7.93% <br />5.95% <br />0.58% <br />0.33% <br />0.33% <br />0.18% <br />0.55% <br />9,776 $10.63 $103,905 4.31 % <br />3.25% <br />0.42% <br />0,33% <br />0.32% <br />9,776 $0.82 $8,000 0.33% <br />0.33% <br />0.00% <br />9,776 $32.13 $314,086 13.04% <br />4.35% <br />8.70% <br />9,776 $0.00 $0 0.00% <br />0.00% <br />0.00% <br />TOTAL <br />9,776 $246.32 $2,407,993 100.00% <br />NOTE: BONDING COSTS SHOULD BE DETERMINED BY COUNTY'S BONDING CONSULTANT <br />NOTE: ESTIMATE ASSUMES TRADITIONAL GENERAL CONTRACTOR BIDDING, CONSTRUCTION MANAGER FEES ARE NOT <br />INCLUDED. <br />NOTE: DISPATCH EQUIPMENT INSTALLATION COSTS DO NOT INCLUDE POTENTIAL RF TOWER EQUIPMENT UPGRADES <br />NOTE: EXISTING SCBA, LAUNDRY/EXTRACTOR, AND GEAR RACKING EQUIPMENT TO BE RE -USED <br />Page 1 <br />