OWNER: City of Ramsey
<br />PROJ: Ramsey Fire Station 2 Replacement
<br />LOC.: Ramsey, Minnesota
<br />TITLE: PRELIMINARY CONCEPTUAL ESTIMATE
<br />Concept Estimate - Option 3
<br />New Construction
<br />acres 5
<br />DESCRIPTION
<br />ADMINISTRATION
<br />LEGAL, FISCAL & ADMINISTRATIVE
<br />SOIL BORINGS
<br />SURVEY
<br />CONSTRUCTION COSTS
<br />Building Demolition - Existing City Hall, Fire Station, Police S
<br />Existing Site Repair (topography only, no fill)
<br />✓New Site Costs
<br />✓New Construction
<br />FEES
<br />A/E DESIGN AND BIDDING FEES
<br />CIVIL ENGINEERING
<br />LANDSCAPE ARCHITECTURE
<br />REIMBURSABLE EXPENSES
<br />PLAN REVIEW FEES & PERMITS
<br />SPECIAL INSPECTIONS AND TESTING
<br />FURNISHINGS, FIXTURES & EQUIPMENT (FF&E)
<br />OFFICE FURNITURE ALLOWANCE*
<br />KITCHEN EQUIPMENT ALLOWANCE**
<br />LAUNDRY EQUIPMENT ALLOWANCE
<br />FF&E DESIGN FEES
<br />TECHNOLOGY
<br />DATA / TELEPHONE
<br />SURVEILLANCE CAMERAS / MONITORS
<br />CONTINGENCY
<br />ESTIMATING (5%)
<br />PROJECT (10%)
<br />FINANCING
<br />BOND ISSUANCE COSTS
<br />INVESTMENT EARNINGS
<br />DATE : 31-Jul-06
<br />REV#:
<br />PROJ#_: 1572
<br />FILE#
<br />NEW'SC(FT
<br />REMODEL SQ FT
<br />AREA TO REMAIN
<br />TOTAL SQ FT
<br />COST/ BUILDING
<br />BUILDING SF
<br />$0.
<br />S8,000
<br />$1,500
<br />$143,000
<br />$20,000
<br />$250,000
<br />S1,368,640
<br />$143,171
<br />$14,000
<br />$8,000
<br />$7,874
<br />$4,454
<br />$13,362
<br />$78,208
<br />$10,000
<br />$8,000
<br />$7,697
<br />$8,000
<br />$0
<br />$104,695
<br />$209,391
<br />$0
<br />$o
<br />COST
<br />SF
<br />BKV
<br />12 C7 u I'
<br />9,775
<br />0
<br />0
<br />9,776
<br />SUB PERCENT
<br />TOTAL TOTAL
<br />9,776 $0.97 $9,500 0.39%
<br />O.00%
<br />0.33%
<br />0.06%
<br />9,776 $182.25 $1,781,640 73.99%
<br />5.94%
<br />0.83%
<br />10.38%
<br />56.84%
<br />9,776 $19.52 $190,862 7.93%
<br />5.95%
<br />0.58%
<br />0.33%
<br />0.33%
<br />0.18%
<br />0.55%
<br />9,776 $10.63 $103,905 4.31 %
<br />3.25%
<br />0.42%
<br />0,33%
<br />0.32%
<br />9,776 $0.82 $8,000 0.33%
<br />0.33%
<br />0.00%
<br />9,776 $32.13 $314,086 13.04%
<br />4.35%
<br />8.70%
<br />9,776 $0.00 $0 0.00%
<br />0.00%
<br />0.00%
<br />TOTAL
<br />9,776 $246.32 $2,407,993 100.00%
<br />NOTE: BONDING COSTS SHOULD BE DETERMINED BY COUNTY'S BONDING CONSULTANT
<br />NOTE: ESTIMATE ASSUMES TRADITIONAL GENERAL CONTRACTOR BIDDING, CONSTRUCTION MANAGER FEES ARE NOT
<br />INCLUDED.
<br />NOTE: DISPATCH EQUIPMENT INSTALLATION COSTS DO NOT INCLUDE POTENTIAL RF TOWER EQUIPMENT UPGRADES
<br />NOTE: EXISTING SCBA, LAUNDRY/EXTRACTOR, AND GEAR RACKING EQUIPMENT TO BE RE -USED
<br />Page 1