My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/08/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 07/08/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:21:08 PM
Creation date
8/25/2014 4:28:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/08/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Section 4.8 of the Connexus Energy "Electric Rate Book --General Rules and Conditions of Service includes similar language as above and discusses when <br />Connexus constructs buried power lines versus overhead power lines. In this particular case, theBunker Lake Boulevard Extension Area is largely undeveloped <br />and un platted; therefore, it doesn't warrant underground service by Connexus Energy standards. <br />Alternatives: <br />(1) Adopt the proposed resolution and move forward with the proposed work order. <br />(2) Do not adopt the proposed resolution and do not move forward with the proposed work order. <br />(positives) the City would save $91,300 in project costs, the option to bury proposed power lines is still available in the future, an overhead power line <br />would still be constructed by Connexus (meaning, electric service needs are met). <br />(negatives) aesthetics of an overhead power line, inconsistent development practice, if power lines were buried in the future the cost would be 2.5-3.5 <br />greater. <br />Funding Source: <br />Tax Increment Financing District #1 as outlined above. <br />Recommendation: <br />Staff recommends the proposed electric service line be buried (underground) rather than overhead (above ground) for three reasons: (1) aesthetics/view-shed for <br />residents and business owners/prospects; and (2) consistency with recent development in the City of Ramsey; and (3) the cost to bury the proposed power line at <br />a later date will cost 2.5-3.5 times more. <br />Action: <br />ADOPT RESOLUTION #14-07-132 AUTHORIZING PAYMENT (Not to exceed $100,000) TO CONNEXUS ENERGY TO BURY ELECTRIC SERVICE <br />LINES FOR PROJECT NUMBER W1401355 <br />Attachments <br />RESOLUTION AUTHORIZING PAYMENT TO CONNEXUS ENERGY TO BURY ELECTRIC SERVICE LINES FOR PROJECT NUMBER W1401355 <br />Reference Man <br />FAOs <br />Connexus Plans <br />Connexus Policy <br />Connexus Franchise Agreement <br />Form Review <br />Inbox Reviewed By Date <br />Diana Lund Diana Lund 07/02/2014 12 35 PM <br />Kurt Ulnch Kurt Ulnch 07/02/2014 04 25 PM <br />Form Started By Patnck Brama Started On 07/01/201408 08 AM <br />Final Approval Date. 07/02/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.