Laserfiche WebLink
Highway 10 Access Planning Study. <br />Additionally, the site is further impacted by the Mississippi River Trail construction, currently underway and <br />commencing construction on this site later this spring. The proposed plat was revised to accommodate the approved <br />alignment of this trail. The trail was awarded a federal grant, and the construction contract has been awarded and <br />construction is already underway. It is not feasible to expect that the trail alignment and construction can be <br />modified at this point without exposing the project to contractor damage issues or unnecessary contract delays as <br />part of the grant award. The Plat can accommodate the alignment of the trail; however, the final grades and <br />improvements necessary to maintain this alignment will need to be verified on the Final Plat documents. <br />The proposed plat contemplates fill within identified floodplain boundaries. It does not appear that any fill is being <br />proposed within floodways. By introducing fill within a floodplain boundary in order to create building pad sites, a <br />Letter of Map Revision (LOMR), approved by the Federal Emergency Management Agency (FEMA), shall be <br />required. Final Plat approval will not be granted until FEMA has approved a LOMR. <br />The Applicant has requested that the City consider constructing the required Stage I and Stage II Improvements <br />(public improvements such as streets and utilities) as a City Improvement Project, then assessing the costs back to <br />the benefited properties. This would impact the Subject Property only, and not adjacent properties. The City <br />Council will be considering this request parallel to this subdivision request. An Assessment Agreement as part of <br />the standard Development Agreement shall be required. This process will come at a future meeting date parallel to <br />the Final Plat Review.The City Council is not approving a road project, plans, authorization for bids, nor an <br />Assessment Agreement at this time. <br />Alternatives <br />Alternative # 1: Approve the Plat as proposed. This alternative will have several outcomes, most notably the <br />elimination of one local road alternative of the Highway 10 Access Planning Study. The City Council has begun a <br />process to formally request that Mn/DOT remove the backage road concept and continues discussions with the City <br />of Anoka. This request could run parallel to review of the Plat and be a contingency of any approval. Please see the <br />narrative at the beginning of this case on specifics of this contingency. <br />Alternative #2: Postpone approval until the City Council has adopted the Highway 10 Access Planning Study. Per <br />Minnesota Statute 15.99, the City must act upon a written request/Application within 60 days of receipt. The City <br />issue the one (1) available 60 day extension to October 2, 2014. The Applicant would need to approve any further <br />extensions beyond that date, or the request would become automatically approved. <br />Alternative #3: Approve a portion of the Plat. Consensus of the Planning Commission and Environmental Policy <br />Board (EPB) was that low density residential along the south side of Riverdale Drive was most appropriate, as <br />those parcels abut the Mississippi River. The Commission previously expressed concern about transition with the <br />proposed lots on the north side of Rivlyn Avenue that would be in close proximity to the existing Employment <br />District or preclude Rivlyn Avenue from being able to be connected to any future local road connection. The <br />Applicant does not desire to only construct a portion of this Plat. <br />Alternative #4: Deny the Plat. The Planning Commission did note concern about adequate transition area between <br />land use types (employment and low density residential). It would appear that the Applicant could move forward <br />with a portion of the Plat, with the remainder to be considered upon completion of the Access Planning Study, <br />complete with findings, future land use scenarios, and feedback specific to these future land use scenarios. Although <br />there are several layers and contingencies to any approval, all issues currently identified appear to be able to be <br />solved. Ultimately, the Planning Commission did recommend approval of the Plat as presented. <br />Funding Source: <br />All costs associated with processing the Application are the responsibility of the Applicant. <br />Recommendation: <br />