My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 09/04/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 09/04/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:21:24 AM
Creation date
9/3/2014 11:58:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
09/04/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key Ramsey Development Projects <br />Under Conshvction <br />Stoney River Assisted Livinp- and Memory Care <br />Background: 72 unit mix of assisted living and memory care units, with a few <br />independent living suites. <br />Developer: First Phoenix Group <br />Location: 14401 Nowthen Blvd. N.W. (intersection of Saint Francis Boulevard <br />[TH 47] and Nowthen Boulevard [CSAH 5]; adjacent to Lord of Life Lutheran <br />Church). <br />Status Update: Rough grading, footings, foundation complete. Framing and <br />roofing underway. Memory care wing exterior largely complete. Work interior to <br />structure has begun. <br />Additional Information: 612-615-9936. www.stonevriverramsev.com. Leasing <br />Office open within Lord of Life Lutheran Church. <br />Anticipated Completion: November 2014 <br />Brookfield 4th Addition <br />Molin Concrete Expansion <br />Background: 10,000 square foot expansion to existing <br />manufacturing and warehouse facility. <br />Developer: Molin Concrete <br />Location: 6820 143rd Ave NW (near Ramsey Public Works <br />Campus) <br />Status Update: Construction underway. Anticipated Completion: <br />Summer, 2014. <br />Village of Sunfish Lake <br />Background: Existing small -lot, single-family development south of Sunwood Drive, east of Sunfish Lake Boulevard. <br />Status Update: Required infrastructure previously completed. Significant new single-family starts in 2014. <br />PARTIAL ELEVATION <br />1 /4. _ 1 <br />Background: 32 single-family lots in existing Brookfield <br />Development. 45 lots remain to be subdivided in future phases. <br />Developer: Brookfield Land, LLC (Capstone Homes). <br />Location: Near Nowthen Boulevard (CSAH 5) and 170th Avenue <br />(within existing Brookfield development). <br />Status Update: Roadway and major utilities substantially <br />complete. Small utilities (gas, electric, etc.) remain to be installed. <br />Building Permits have been issued for individual construction. <br />Additional Information: 763-427-3090. www.caostonehomes- <br />mn.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.