Laserfiche WebLink
• Tax base generated by this proposed development falls under TIF 14, meaning the majority <br />of generated taxes (roughly 90 %) are dedicated back to the TIF 14 fund and the remainder <br />(roughly 10 %) are dedicated back to the City's General Fund <br />• Construction start is pending with a desired start in Fall 2014 or Spring 2015 <br />• Road (between Outlot A and B) to be constructed by PSD to City of Ramsey specifications. <br />This road will then be handed over to the City of Ramsey for maintenance, etc. <br />• Re- platting to be done by PSD to meet their specifications <br />• Zoning related items regarding parking structures /floor area ratio (density -- could drive <br />need for parking structure) still need to be determined; PSD has indicated interest in <br />structured parking as it relates to the master COR plan -- these items to be reviewed at time <br />of site plan submittal <br />Update <br />Planning Commission will be reviewing a concept plan provided by PSD on the 4 th of Sept. The <br />HRA will be reviewing the same concept, based on PC feedback, on the 9 th of Sept. Please click <br />here for more information. <br />