My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 10/09/2014
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2014
>
Agenda - Economic Development Authority - 10/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:29:10 PM
Creation date
10/9/2014 9:13:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
10/09/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Group 5 simulated a full conversion of Thurston Ave. to a grade separated intersection by removing the <br />traffic signal for eastbound traffic. Delay and the number of anticipated crashes was expected to decrease at <br />both Thurston and Sunfish Lake. <br />• Project Group 6 — Sunfish Lake Blvd. Eastbound and Westbound Free Flow <br />The last project group grade separated the eastbound movement at Sunfish Lake Blvd., and removed the last <br />signal for mainline Highway 10 through traffic until Elk River. This project group assumed a High T intersection <br />in Subarea 4 which removed the through movements as well as northbound and eastbound left turns. However, <br />these movements were routed to other nearby intersections. <br />HIGHWAY 10 ACCESS PLANNING STUDY 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.