Laserfiche WebLink
IMPLEMENTATION PRIORITIES <br />Opportunity/Development/Safety Driven Priority <br />The final category includes up to nine other projects or investments necessary for the long-term preservation <br />of safety and mobility on Highway 10 within the study area. There is not necessarily an immediate need for <br />these improvements but it was recognized that some access conditions are not sustainable. Triggers for the <br />implementation of improvements in this category include safety issues and development driven opportunities <br />for changes in access, reduced conflict intersections and the extension of the local supporting roadway system. <br />These improvements would include the removal of nearly 25 access points, provide up to two additional grade <br />separated crossings of the railroad, continue to develop the local street system in developing areas, and prevent <br />future signalization on Highway 10 in the study area. These opportunity driven priorities are projected to cost <br />between 18-44 million dollars. <br />HIGHWAY 10 ACCESS PLANNING STUDY 96 <br />