My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 10/09/2014
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2014
>
Agenda - Economic Development Authority - 10/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:29:10 PM
Creation date
10/9/2014 9:13:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
10/09/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3: SUPPLEMENTAL INFORMATION <br />1. The City is not master planning this entire developable area. It is unknown where internal <br />driveways, roadways and cub -cuts will be needed. Therefore, the design of Bunker Lake <br />Boulevard and Puma Street should not include any new curb -cuts. <br />2. Stubbing of sewer and water utilities along Bunker Lake Boulevard and Puma Street should be <br />completed at regular intervals; based on future landuse needs per the recommendation of the <br />firm awarded this work. This recommendation should be made with a balance of cost <br />implications and market demand in mind (or experience with other business parks). <br />3. Cost estimations and design should include: roadway, sidewalks, stormwater management, <br />trails, street lighting, trunk water service and trunk sewer service. <br />4. The intersection at Armstrong Boulevard was constructed in 2011. The City would like to <br />confirm this intersection was constructed to accommodate traffic demands outlined in the <br />Appendix landuse maps. This confirmation may be a simple narrative. <br />5. As -built of existing infrastructure is available upon request (e.g. Bunker Lake Boulevard was <br />recently, partially, improved in anticipation of a new private school development). <br />6. The City has adopted Comprehensive Sanitary Sewer and Water Plans. These plans should be <br />reviewed and consulted as forecasting and design work is completed. <br />RFQ Future Business Park Professional Services: City of Ramsey 09/25/2014 Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.