My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/14/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 10/14/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:27:41 PM
Creation date
10/15/2014 9:33:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROAM AA RECONSTRUCTION ASSFSS T PO <br />SECTION I — General Policy Statement <br />cY <br />I. GENERAL <br />The purpose c f this document is to establish a standard assessment policy for o <br />reconstruction projects within the City Of Andover. <br />Roadway <br />streets that ha <br />which the Ci <br />replacement <br />curb and gu <br />st©rnx serer <br />seotiort exists. <br />way <br />etion projects are defined as local and/or M. ipal State Aid City <br />an.' existing bituminous surface .anal. have reached a.le'v .of distress in <br />Engineer determines that the roadway is in poor condition such Taf f►.tll <br />warranted. mprovem ents consists of a nevi bituminous mince, ce, cones <br />•(if to:in red by the City's Concrete Curb and Gutter Policy), addition <br />needed, storm sewer replacement and sheet widening it a substandard <br />E eet and sto sewer/dr inage costs are apportioned to the properties benefiting fit mt <br />the project. A portionirg•the costs of the street and storra sewer construction may be <br />don by di vi g the cost of tho street improvement by the assessable from footage of <br />the benefiting roportico to determine a cost for linear front foot or by dividing the cosh <br />of the, street, provements by the number of benefiting lots. This is exp!aiaed'under the <br />Methods ofAs easment <br />The nature of e street improvements dictate whether or not concrete curb and gum is <br />zciiuied (Per he City's concrete curie and gar policy). The following is a list of <br />reconstruction ?rolects where concrete curb and gutter is required: <br />i s Existin Municipal State Aid Routes (IfMSA ceding is used) <br />2. Regions ction Projdcts. <br />• oral w! Existing Bituminous curb <br />carat w./ no ourb or drainage ditches <br />Urban • <br />3. Exist Business Areas (Commercial, Retail, lndustiiat) with a <br />drainag ;ditches or existing bituminous curio is in.place <br />Roadway reconstruction areas shall be identified in. the City's Capital Improvement•piau <br />(CRC) at least wo years prior to construction. The CA' is a fluid document in which <br />roadways will 1}e identified in the plan, but tuay be moved to a later date; if those areas are <br />not within two years of reconstiuctiorz and other areas have been found fo be in greater <br />need afrepair. • <br />Assessments for other improvements (sanitary sewer, water main, etc.) included in a road <br />reconstruction Ltoject shall follow the City's standard assessraentpolicy. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.