My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/14/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 10/14/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:27:41 PM
Creation date
10/15/2014 9:33:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/14/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Methods ofAdpessme1Zt. <br />• <br />The City Council hag approved two (2) methods (Unit & Front Footage) of assessing <br />roadway reconstruction projects. It should be emphasized that the special assessment <br />method and pglicies sun n arized herein cannot be considered as all-inclusive and. that <br />unusual circumstances may at times justify special considerations. <br />Unit (Lo <br />lliit is a parchi or lot in anarea. that cannot be further' subdivided, i.e., is a singly family . <br />It 4.Zone the standard m nirmim lot is ,8O' x 130'. If a parcel can be subdivided one <br />assessmentpe, potential parcel will be assessed for as manyunits as can be subdivided in.- <br />That particular zoning •district. In a unit assessment, 25°% of the total project costs would • • <br />be divided equally amongst all units in a development, resulting in a uniform assessment <br />per tot. - <br />Front Footage <br />Frontage footge assessment maybe utilized in areas in which large parcels weist that can <br />subdivide or : n which. there are different types of land uses (residential, commercial, <br />industrial). In a front footage assessment, 25% of the total project costs would be divided <br />by the total font footage for all Tots witigu the project limits: Front footage ibr comer <br />lots would be 3eterrninecl byadding the length of the short side gad half of tlw long.sicle. <br />The cb s$ per :Cat foot would then be multiplied by each m is calculated fxont footage to <br />determine there assessment. It is T&ely gin this method would.tesirlt in efferent <br />assessments par parcel. If a Iarge parcel has the potential to fully develolr.(44 Acre <br />subdivision) tl.e City Co-cr-iril has the discretion to assess more than just the float footage. <br />This would be identified and approved in the feasibility report . <br />Adopted /I,Jbc <br />, . <br />Attest: . <br />04 Clerk <br />• <br />leed*.&‘ <br />Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.