My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/21/2014
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2014
>
Agenda - Public Works Committee - 10/21/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:41:50 AM
Creation date
10/20/2014 8:46:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/21/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUTURE CONDITIONS ANALYSIS <br />Overall delay within the corridor is projected to increase from the projected total with improvements in 2013 but <br />to a level less than the existing conditions for the evening rush hour. Eastbound traffic is driving the increase <br />compared to 2013 traffic volumes and improved intersections due to the capacity limitations for southbound left <br />turning vehicles at Thurston. <br />Other congested areas seen in the traffic model include but are not limited to the TH 47 at Bunker Lake Blvd. <br />signal and northbound TH 169 and northbound Main St. approaching Highway 10. These congested areas are <br />limiting the number of vehicles entering Highway 10. If these bottlenecks are removed/addressed, likely delays <br />on Highway 10 will increase as the number of vehicles on the highway increases. <br />HIGHWAY 10 ACCESS PLANNING STUDY 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.