Laserfiche WebLink
CC Work Session 2. 1. <br />Meeting Date: 10/28/2014 <br />Information <br />Title: <br />Consider Land Transaction Proposal from St. Katherine Drexel <br />Purpose/Background: <br />PURPOSE <br />Consider a land transaction proposal from St. Katherine Drexel which would include swapping 33.18 acres of St. <br />Katherine Drexel owned land located adjacent to Central Park for 10 acres of HRA owned land within The COR. <br />BACKGROUND <br />Request/Case: This case will require significant discussion related to a large number of policy questions (which are <br />outlined in the policy discussion section below). Staff does not anticipate the Council will be in a position to <br />provide final/clear direction at the conclusion of this discussion. However, the Council may be in a position to <br />provide preliminary direction and input for St. Katherine direction and Staff to guide future discussion and <br />negotiations. The purpose of this case is to discuss the high-level concept proposal and policy questions; it is not to <br />negotiate finite details of an agreement. <br />Proposed Use: St. Katherine Drexel would like to acquire 10 acres of land located within The COR to serve as the <br />long-term/ permanent home of their church and auxiliary campus; they are looking to construct a 20,000 square foot <br />facility with a 500 seat auditorium (similar to Northgate); they would like frontage along Sunwood Drive; they are <br />both aware -of and accepting -of zoning standards within The COR. <br />It is Staffs understanding/estimation, only 3-5 acres of the 10 acre proposed site would be utilized for the proposed <br />St. Katherine Drexel Church. The remaining portions (5-7 acres) would remain unimproved for an unknown <br />amount of time (15-100 years). The remaining portions of this site would be reserved for future expansions and <br />other auxiliary uses. Additionally, it should be noted, the first phase of the proposed project (20,000 square foot <br />facility) has an unknown construction timeline as well; as St. Katherine Drexel is currently in the process of <br />fundraising. It is Staffs understanding, St. Katherine Drexel is NOT interested in acquiring a small sized lot. <br />Attached to this case is an unofficial/conceptual reference map. <br />HRA Owned Land: is located within the The COR and is commonly referred to as parcel/listing #48 (which is <br />about 20 acres in size total). This parcel has an asking price of $4.00 per square foot --which, equates to a <br />$1,742,400 total asking price (for 10 acres as desired by St. Katherine Drexel). This site is visioned/guided for retail <br />and office type users. This site is located in two zoning districts: mostly in COR-2A and partially in COR-1. All <br />utilities and infrastructure required for development are located at the property line today. <br />St. Katherine Drexel Owned Land: is located directly east of Central Park (a City owned community park). This <br />33.18 acre site is surrounded by single family residential developments on three sides. This site is zoned R-1 <br />MUSA. County records show this site was purchased for $740,200 in 2004; and shows an estimated market value in <br />2015 of $205,000. CBRE typically lists R1-MUSA residential properties at a $40,000 per acre. It is unofficially <br />estimated 4.5 acres of this site is unusable wetlands. Therefore, the total usable space is estimated near 28.68 acres <br />of land. Generically utilizing CBRE pricing from existing City listings for R1-MUSA residential properties, the <br />asking price for this parcel would be $1,147,200. This site does not include sewer and water services located at the <br />property line (preliminarily estimated $150,000-$300,000 cost). <br />POLICY DISCUSSION <br />