My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 10/04/1988 - Special
Ramsey
>
Public
>
Minutes
>
Council
>
1988
>
Minutes - Council - 10/04/1988 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:27:00 PM
Creation date
2/12/2004 11:19:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Title
Special
Document Date
10/04/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMMI indicated that they had reactivated their transfer station in <br />Blaine which increased their costs but due to the comgetitive market <br />environment have not been able to pass these increases to the <br />consumer. To the contrary, the restricted operations and imminent <br />closure of the Anoka Landfill has helped to heighten the awareness <br />that alternative methods of dealing with our solid wastes are <br />required. <br /> <br />Proposed End Use <br /> <br />The entire discussion of the proposed end use is relegated to approxi- <br />mately one page and in essence says the landfill will be open green <br />space with perimeter fencing with a possible ski facility on a portion <br />of the site. Open green space generally connotes something that is <br />viewed as an amenity due to its uniqueness, aesthetic or other <br />characteristics. A side benefit usually associated with this is the <br />ability to serve as a recharge area or sedimentation area with <br />permeable surfaces. The landfill with or without expansion does not <br />connote such an amenity. The end use and ultimate productivity of the <br />landfill site has been an issue that the City has raised repeatedly. <br />Yet, the EIS, as usual, passes this off with only superficial <br />discussion. At some point, and there is no more appropriate time than <br />this, the Metropolitan Council has to come to grips with the end use <br />of landfills, if indeed, they are to be constructed in this manner. <br />Although if it is possible to develop.and operate a viable ski hill on <br />the landfill, it would be a benefit to the City. This proposed <br />concept, however, is yet subject to approvals by the regulatory <br />agencies. <br /> <br />Alternatives <br /> <br />The description of alternative actions also relies almost in its <br />entirety on the CON application and MC's review of that application in <br />1986. As previously indicated, actions which were determined by MC as <br />neither feasible nor prudent have been in place for six months. <br />Further, the discussion regarding whether Elk River Landfill is <br />capable of accomodating the demand forced on it by the closure of <br />Anoka Sanitary Landfill is dated. Most of the factors which MC <br />indicated as restricting Elk River Landfill's abilities have already <br />been alleviated. <br /> <br />The assessment does not take into account the impact of the restricted <br />crossing at the Mississippi River bridge, its impacts on alternative <br />routes or landfill destinations imposed by the bridge restrictions <br />and, therefore., distorts the actual costs of waste hauling when <br />comparing alternatives to the expansion. The traffic/economic impacts <br />created by the bridge restrictions may be readily available to MC <br />through Anoka ~ounty's EIS on Site P. We would assume the County is <br />evaluating haul routes with the bridge restrictions as a <br />consideration. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.