Laserfiche WebLink
J. Unit Costs for Trail Overlay <br /> <br />The following section includes costs associated with materials and labor for an overlay project on a <br />segment of trail in Ramsey <br /> <br />~MATERIAL COSTS <br /> ASPHALT =25.85/TON <br /> TACK OIL =I5.00/5 GALLON PAIL <br /> TRUCKING/LABOR =50.00/HR <br /> LABOR = 2.75 X WAGE <br /> 14.60 X 2.75 = 40.15 <br /> 19.20 X 2.75 = 52.80 <br /> <br />2. CENTRAL TtLhlL <br /> <br />NLSTERIAL <br /> ASPI4ALT <br /> TACK <br /> TRUCKING <br /> LABOR <br /> <br />25.85/TON X 12 TON = ,~ 310.20 <br />15.00/PAIL X 5 PAILS = 75.00 <br />50.00 X 2 TRUCKS X 4 HOURS = 400.00 <br />14.60 X 2.75 = 40.15 X 4 = 160.60 <br />19.20 X 2.75 = 52.80 X 4 = 211.20 <br /> $1157.00 <br /> <br />Trail Length = 175' X 8.5 WIDE <br />Overlay thickness = 1.5" <br /> <br />Unit Price = $6.61/llnear foot <br />Unit Price = $7.00/square yard <br /> <br />46 <br /> <br /> <br />