My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 10/21/2014
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2014
>
Minutes - Public Works Committee - 10/21/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:50:48 PM
Creation date
11/24/2014 9:47:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
10/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br /> aware of all of them. He raised the point that with the impervious surface areas, there should be <br /> holding ponds based on the size of the development. <br /> City Engineer Westby responded the majority of these situations existed prior to incorporation of <br /> the township, and there were no rules and regulations then, as there are now. The WMO did not <br /> exist, and there were no standards. <br /> Chairperson Backous questioned if other cities are having similar issues. <br /> City Engineer Westby answered there are more issues in the outlying suburban areas and <br /> developing cities. Ramsey is unique in how flat it is, and there is little relief from one side of the <br /> City to the other. Installing pipes in one area could make it worse in another. This would need <br /> to be done in the correct order. <br /> Chairperson Backous commented that this seems like the tip of the iceberg. He stated he has <br /> been on the Council four years now, and every year a homeowner comes forward for the <br /> neighborhood. He suggested the City work with Nowthen and Oak Grove and the Met Council <br /> to start planning a solution. He said this seems like a major infrastructure problem such as sewer <br /> and water. <br /> Development Services Manager Gladhill explained there is a rigorous process for new <br /> developments. There are better grading plans, flood plane maps, and the existing elevation is <br /> considered. <br /> Chairperson Backous noted that in this case, the homeowner noted prior damage, so this flooding <br /> happened before. He acknowledged that it is very difficult for homeowners to repair their homes <br /> from flood damage repeatedly. <br /> City Engineer Westby indicated staff is working on this issue. He added that possibly infiltration <br /> basins are the way to go. <br /> Councilmember Riley asked if staff has gone to the property at 17421 Gibbons St and if so, if <br /> they found any obvious problems. <br /> City Engineer Westby responded staff has been there, and there is nothing obvious. There is <br /> nothing showing that has been done incorrectly. Other than studying the GIS system, and where <br /> piping can go, there is not much that can be done right away. To put in piping would mean <br /> having to acquire easements. <br /> Councilmember Riley inquired what is considered the modern era in building. <br /> City Engineer Westby replied codes change so often that it is difficult to keep one standard. He <br /> said his quick answer to the question may be late 1990s. Stormwater was not a large <br /> consideration back in the 1970s and 1980s. The emphasis did not come until the 1990s. <br /> Councilmember Riley stated it was worse than normal this past spring. <br /> Public Works Committee / October 21, 2014 <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.