~CASE # ~¥ <br /> <br />Background: <br /> <br />1998 STREET MAINTENANCE PROGRAM <br />By: Steve Jankowski, City Engineer <br /> <br />The purpose ot~ the: annual street maintenance program is to address the routine maintenance <br />needs of the C~ty's pavements on a periodic basis so as to maximize the life of pavement. <br />Attached to this case is a table which summarizes the history of the City's bituminous <br />pavements. The frequency of maintenance on pavements has varied considerably, with some <br />pavements rec~ving a sealcoating as little as two years and others as much as ten years after <br />being constructed. In general, however, our current policy is to schedule sealcoating of new <br />pavements thei first time at five years after construction and to subsequently readdress <br />maintenance n~dS at seven year intervals. <br /> <br />Also attached go this case is a current summary of the City's last six street maintenance <br />programs. Ov0i' the last three years, the annual expenditure has been in the range of $200,000 to <br />$250,000. Th~ Proposed 1998 Street Maintenance Program will be substantially higher since it <br />is proposed to ~verlay 5.5 miles of State aid street utilizing MSA funds. <br /> <br />In the past, tho programming for the street maintenance program has been based solely on the <br />length oft~me Smee the pavement was last maintained. In 1996, with assistance from our interns, <br />all pavements ~ere rated on a relative basis. Each street segment in our inventory has been <br />assigned a pavement rating from 1 to 10. Pavement ratings 8 through 10 require little or no <br />maintenance; ~ pavement rating of 7 requires minor crack filling. Pavement ratings of 5 and 6 <br />can benefit from Sealcoating. Pavement ratings of 3 and 4 require bituminous overlay. <br />Pavement r.ati~gs of 1 and 2 require reconstruction. Attached is a summary of the condition of <br />the City's b~inous pavements. In making decisions on the scheduling &routine maintenance, <br />pavement condition rating is used as an additional factor. <br /> <br />In the past, ttCe street maintenance programs have been financed by a combination of funding <br />sources including :special assessments, City funds contributed by a dedicated PIR fund, and <br />developer esCrOws, Escrows are collected from new developments and are set aside to fund the <br />first sealcoat~g of the streets. 'This is generally done after the pavement is five years old. The <br />1998 program!proposes to utilize $95,660 in developer escrows to provide the first sealcoating <br />for the street$~ontained in Project #98-01. This project includes 8.70 miles of pavement and is <br />comprised ofi28 individual subdivisions, all containing lots in the municipal sewer and water <br />area. The PaVements within these subdivisions were constructed between 1992 and 1995. This <br />escrow is anticipated to cover most of the project cost, however, a small assessment in the range <br />of $20 per uhit on 770 benefited properties is anticipated to cover the total project costs in <br />accordance wilh our current policy. <br /> <br />The 1998 Street Maintenance Program proposes seven additional crack fill/sealcoat projects. <br />#98-02 through #98-08, which will be organized by individual subdivision as has been the past <br />practice. Thoi total project costs for these projects will be divided equally between the City and <br /> <br /> <br />