Laserfiche WebLink
Review File: Fire Station No. 2 (5650 Alpine Dr NW) <br />Site Plan Review: Comprehensive Plan and Zoning Code <br />November 26, 2014 <br />Page 5 of 5 <br />Miscellaneous Standards. The proposed site plan appears to be consistent with Section 117-114 Subds. (3) through <br />(13). <br />Parking: Staff has measured required parking based on one (1) space per 1,000 square feet of apparatus bay area and <br />one (1) stall per 300 square feet of office space area as required by City Code Section 117-356 (Commercial and <br />industrial off-street parking). The proposed site plan appears to be consistent with the standards below. <br />Standard <br />Required Proposed <br />Office Parkinu Stalls <br />Stalls Re . uired Based on A s aratus Bay <br />Total <br />10 stalls <br />15 stalls <br />6 stalls <br />15 stalls <br />16 stalls <br />30 stalls <br />Standard <br />Required ' r �` ®, se • <br />Stall Width <br />9 feet <br />9 feet <br />18 feet <br />18 feet <br />24 feet Mi. 24 feet <br />Advisory Comments: Geotechnical Soils Report. The Site Plan does include a geotechnical soils analysis report. <br />The BKV Group has reviewed the soils report with its applicable sub-contractor(s) and recommends that the number <br />of soil borings and the results of the soil borings are adequate at this time. As a disclaimer, the geotechnical report is <br />a sample of soil locations; it is possible that negative soil conditions could be found during construction. However, <br />the report utilized industry standards and appears to be adequate to determine acceptable soil conditions for <br />construction. <br />Recommendation. City Staff is recommending that the City Council adopt Resolution #14-12-250 approving the <br />Site Plan for Fire Station No. 2, with amendments as outlined in this Staff Review File. <br />Next Steps. Following Planning Commission Review, the Site Plan will be forwarded to City Council for <br />consideration. As noted previously, this Site Plan Review is separate from the competitive bidding process required <br />for City projects. Approval of the site plan does not guarantee approval of the project itself. The Project Management <br />Team will coordinate the bidding and final approval consideration following commencement of the Site Plan Review <br />Process: <br />