My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 11/18/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 11/18/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:28:28 PM
Creation date
12/5/2014 11:12:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
11/18/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF BLAINE - PUBLIC IMPROVEMENT - SPECIAL ASSESSMENT POLICY <br />4. Water Lateral <br />Water lateral costs are apportioned to the properties served by the lateral water main by <br />dividing the assessment costs by the front footage of the benefiting properties or by dividing <br />the assessment cost by the number of benefiting unit/lots (including equivalent unit/lots). <br />Where lateral service is provided by a trunk, the properties so served are assessed a "typical" <br />lateral cost similar to other properties served by a lateral. <br />NOTE: Reconstruction of sanitary sewer and water main utility systems is to be paid by the Utility Fund, <br />however, should funds not be sufficient, the above procedures would be utilized. <br />5. Storm Drainage Area Improvements <br />New or reconstructed storm drainage area improvement costs are apportioned throughout the <br />gross area that is served by the storm drainage improvement. The costs are uniformly <br />apportioned to each parcel in proportion to parcel area. In a residential plat, the gross area of <br />the plat is multiplied by the assessment cost/acre and that amount divided by the number of <br />unit/lots and equivalent unit/lots in the plat. <br />6. Streets <br />a) New street costs are apportioned to the properties served by the street improvement by <br />dividing the entire cost of the street improvement by the front footage of the benefiting <br />properties (including equivalent unit/lots) or by dividing the cost of the street improvement <br />by the number of benefiting unit/lots (including equivalent unit/lots). <br />b) Reconstructed street costs for projects are apportioned to the properties served by the <br />street improvement as defined in Section 111.7. <br />c) Residential zoned properties are considered to be served by a street, and thus eligible for <br />being assessed for an improvement project based on the following qualifications: <br />• The property has a driveway connection to the street. <br />• If multiple driveways connect to multiple streets, the address of the property will <br />determine which street serves the property for assessment eligibility purposes. <br />d) Commercial and Industrial zoned properties, multi -family residential properties with <br />greater than 5 units/acre density and manufactured home parks are considered served <br />by a street, and thus eligible for assessment based on the following qualifications: <br />• The property has a driveway connection to a street. <br />• Corner lots will be assessed for each street abutting the property. A 150 foot corner <br />lot credit will be given on the long side of the property. <br />e) The life expectancies of various street pavement procedures differ. If an additional <br />improvement is needed to a street that has had a previously assessed street <br />H:\TEAM\GISENG\PVMT-MGT\SPECIAL ASSESSMENT POLICY\SPECIAL ASSESSMENT POLICY.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.