My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 11/18/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 11/18/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:28:28 PM
Creation date
12/5/2014 11:12:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
11/18/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
special considerations listed in Section 6 and the proposed assessment percentages/rates in Section 10. <br />Currently, the special conditions in Section 6 require the City to cover required costs for subgrade excavation, rural <br />to urban street conversions, and oversizing of City streets. These special considerations are intended to reduce <br />assessments for property owners for items that are unknown to them and/or outside of their control. This is <br />important to note in that special assessments levied at the minimum rate of 20% as required for assessment bonding <br />can easily exceed $10,000 on larger benefiting properties more than one -quarter acre in area which comprises a <br />majority of residential properties throughout the City. <br />Attached is a layout showing the higher density residential urban properties throughout the City (shaded properties) <br />that would likely allow the use of a 25% assessment to reconstruct abutting City streets. All other properties would <br />likely be required to pay a maximum fee established annually by the City Council to ensure their assessment does <br />not outweigh their benefit. Staff currently recommends a maximum assessment amount of $7,000. <br />In recent years it has become more common for property owners to challenge their special assessments, especially <br />when assessments exceed $7,000. It may therefore be difficult to defend a residential property assessment in excess <br />of $7,000 within the City of Ramsey if challenged. Some cities now perform appraisals on one or more <br />representative properties before projects are ordered to determine if the preliminary assessments can be defended, <br />but this in turn increases project costs and assessment amounts. Still other cities contract with appraisers to <br />complete benefit appraisal consultations that consider sale and re -sale figures for properties recently assessed for <br />similar improvement projects in similar cities to help determine actual benefit costs prior to ordering a project. <br />Jason Messner with Patchin Messner & Dodd will be in attendance to address any questions the Council may have <br />regarding benefit appraisals and appraisal consultations. <br />The draft Policy includes numerous revisions to reference and ensure compliance with our City Charter <br />requirements. The City Attorney is also reviewing the draft Policy to ensure it has the proper legal form and that it <br />conforms to our Charter assessment requirements per Chapter 8 of the Charter, which is attached for reference. <br />During the October 14th Council work session, more information on previous assessments was requested. Property <br />owners in the City of Ramsey were primarily previously assessed for sealcoat and overlay projects. However, a few <br />assessments have been levied for street reconstruction projects and for upgrading gravel roads to paved roads. <br />Typically, assessments for such projects in the City of Ramsey have ranged from; <br />• Street Sealcoats — 0% to 50% of project costs assessed. Assessments were generally up to $500 for residential <br />and $2,000 for commercial/industrial properties. <br />• Street Overlays — 50% of project costs assessed. Assessments were generally up to $2,000 for residential and <br />$7,000 for commercial/industrial properties. <br />• Street Reconstructions — Staff was still researching this information at the time this case was published. This <br />information will either be republished in an updated case before the work session, or the information will be <br />presented at the work session. <br />• Gravel Road to Paved Road Upgrades — Staff was still researching this information at the time this case was <br />published. This information will either be republished in an updated case before the work session, or the <br />information will be presented at the work session. <br />• Sidewalk Reconstruction — 0% of project costs were previously assessed, though the current draft Policy calls <br />for a 25% assessment rate. <br />Appendix B, which was developed as an attachment to a January 19, 2010 Public Works Committee case, is also <br />attached for reference. This lists previous Street Maintenance Program assessment practices, including effective <br />dates. <br />Council also asked where the four -fifths majority vote reference in Section 3.3 originated. This language comes <br />directly from State statute 429.031. <br />Council also requested that Staff review the language in Section 6.4 regarding interest rates. This language has been <br />revised with input from Finance Director Lund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.