My WebLink
|
Help
|
About
|
Sign Out
Home
05/05/91
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1991
>
05/05/91
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:16:19 AM
Creation date
2/20/2004 9:35:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
05/05/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.07 Rules and Procedures <br /> <br /> Subd. 1. Adoption of Rules and Procedures. The Commission or <br />Board shall adopt such rules and procedures not inconsistent with these provisions as may be <br />necessary for the proper execution and conduct of business. <br /> <br />2.04 <br /> <br />The Board of Building Appeals <br /> <br />2.0 4.01 Creation. The Ramsey Building Code Board of Appeals is created pursuant to <br />§204 of the Building Code of the City of Ramsey adopted by §8.01 of the City Code, and is <br />hereinafter referred to as the "Board". <br /> <br />2.04.02 Subd. 1. Meetings. <br /> <br />Annual Meeting. The Annual Meeting of the Board shall be held each year <br />on the second Monday in January. <br /> <br />bo <br /> <br />Regular Meeting. Regular meetings of the Board shall be held on notice <br />from the secretary within ten working days after an appeal is filed with the <br />Board. If additional time is required, an extension to the ten working days <br />may be granted with approval of the chairperson. <br /> <br />2.0 4.0 3 Application and appeals. <br /> <br />Subd. 1. Application. <br /> <br />ao <br /> <br />Form. Each application and appeal shall be in writing and shall contain such <br />information as hereinafter prescribed. <br /> <br />Application for Permission to Use Alternate Materials and <br />Methods of Construction. An application for permission to use alternate <br />materials or methods of construction shall first be submitted to the Building <br />Official for approval or denial and shall include: <br /> <br />The name and address of the applicant, and if the applicant is acting as <br />agent for another, the name and address of the person, firm, or <br />corporation for whom the applicant is agent. <br /> <br />A description of the type of building or structure and the work to be <br />performed for which permission to use alternate materials or methods is <br />requested. <br /> <br />3. A description of the use and occupancy of the building or structure. <br /> <br />A citation to the controlling section or sections of the Uniform Building <br />Code which specify the materials or methods for which alternates are <br />requested. <br /> <br />A description of the alternate materials or methods of construction <br />proposed to be used. <br /> <br />If a test is required by the Building Official pursuant to Sections 106 and <br />107 of the Building Code, a report from an approved agency which has <br />tested the proposed alternate materials or methods of construction. Such <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.