Laserfiche WebLink
50. <br /> <br />51. <br /> <br />52. <br /> <br />53. <br /> <br />54. <br /> <br />55. <br /> <br />56. <br /> <br />57. <br /> <br />N~)nassignabilitv of OtJP. Any rights conferred on Aluminum Recycling, Inc. by <br />this CUP are personal to the Permit Holder. The City is issuing this CUP on the <br />basis of the credit and reputation of the Permit Holder. The Permit Holder shall <br />not assign or transfer this CUP without first obtaining approval of the City <br />which may allow or disallow such transfer in its absolute and sole discretion. <br />In the event of transfer, the CUP shall apply to the Permit Holders' successors <br />and assigns. In the event the City declines for any reason to allow the transfer <br />of this CUP, the Permit Holder shall either continue with aluminum processing <br />operations in full compliance with the terms of this CUP or terminate aluminum <br />processing operations at its option. <br /> <br />On-site Inspection. The City reserves the right to inspect the site for the <br />purposes of examining and copying non-privileged records; conducting <br />inspections, surveys, investigations, monitoring or sampling; and obtaining <br />necessary information pertaining to the construction, operation and environ- <br />mental effect of the aluminum processing facility. Inspections shall be <br />conducted during normal business hours .except in the event of an emergency. <br />City personnel or agents performing the insp'ection will provide reasonable <br />notice to the Permit Holder's personnel prior to the time of inspection. <br /> <br />Documents and Plans. Copies of all documents, plans, or other reports which <br />are required to be supplied to the MPCA or Anoka County shall also be supplied <br />concurrently to the City at no cost to the City. <br /> <br />Operations. This permit is based on conduct of operations as described in the <br />Permit Holder's submittals of February 22, 1991 as follows: <br /> <br />History of Business <br />Operational Plan <br />Site Plan (not dated) <br /> <br />The identified supporting documents are incorporated herein by reference. <br /> <br />Performance Review. The performance of this operation shall be reviewed by <br />the City Council to identify problem areas, concerns, and to evaluate whether <br />conditions of this CUP need to be modified or procedural changes made. An <br />initial performance review shall occur within six months after commencement <br />of operations. <br /> <br />10 <br /> <br /> <br />