Laserfiche WebLink
Mr. Jack Ippel - 2 - DecembeA 13, 1983 <br /> <br />PHASE Ia <br /> <br />Agency/~r~Ject Coordination <br /> <br />InventoKy <br /> <br />A. History of Airport <br />8. Role in Metro Area <br />C. Description of Facilities <br /> l) Review of Existing Conditions <br /> ~2) Users View of Facilities <br />D. H4storical Activity <br /> l) Based Aircraft <br /> 2) Operations <br /> E. DefiCiencies/Limitations of Facilities & Site <br /> F. Aircraft Usage Survey <br /> <br /> $800.00 <br />$1,750.00 <br /> <br />Activities Forecasts (1983-2003) <br /> <br /> A. Relationship to MAC System & Metro Region <br /> B. Develop Activities Forecasts <br /> 1)' Based Aircraft <br /> 2)~ Operations <br /> 3) Aircraft Mix · <br /> <br />$1,500.00 <br /> <br />4. Facility Requirements <br /> <br />$3,250.00 <br /> <br />Determine Facilities from Forecast & Role for: <br /> A. A~rslde <br /> l) Runway <br /> 2) Taxiway <br /> 3) Operation Limitations <br /> 4) Approach Aids <br /> 5) Lighting <br /> B. LandSide <br /> 'l) Terminal Area <br /> 2) Airport Access Plan <br /> 3) Aviation Related Business Area <br /> <br />5. Field Data~Collection <br /> <br />$6,600.00* <br /> <br />A. Aerial Topography & Site Control <br /> (We have the option of a new topo to be flown in the spring <br /> of 1984 at $4,050.00 or to update the existing topo at $3,000.00.) <br />B. Obstruction Survey <br />C. Soils Report <br />D. Document Utilities <br />E. Prepare Property Map (one sheet) ' <br /> <br />* Based on updating existing topo. <br /> <br /> <br />