My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/08/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 01/08/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:22 AM
Creation date
1/15/2015 12:12:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/08/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular Planning Commission <br />Meeting Date: 01/08/2015 <br />By: Tim Gladhill, Community Development <br />5. 5. <br />Information <br />Title: <br />Review Concept Plan for a Telecommunications Tower of at least 200 Feet in Height; Case of Connexus Energy <br />Purpose/Background: <br />The purpose of this case is to review a concept from Connexus Energy to construct a communications tower of at <br />least 200 feet in height on the Connexus Energy Campus located at 14601 Ramsey Blvd NW. The proposed tower <br />would be of monopole design, similar to most recent cell towers constructed. The most common alternative to <br />monopole design is a lattice design. The purpose of this tower, according to Connexus Energy Staff, is to <br />implement 'smart -grid' communications that would allow Connexus Energy to instantly communicate with various <br />equipment such as sub -stations and customers' electric meters. This is not an official request for a land use <br />application but an opportunity for the City to provide policy feedback to assist Connexus Energy in preparing a <br />request to the City. <br />Notification: <br />Notification is not required at this time. A telecommunications tower such as this would require the issuance of a <br />Conditional Use Permit, which does require notification in the City's Official Newsletter and notifications to <br />adjacent Property Owners. <br />Observations/Alternatives: <br />The proposed tower would be subject to City Code Section 117-428. This Section provides minimum design <br />standards for towers to balance public safety, aesthetics, and adequate telecommunications coverage. The intent for <br />constructing the proposed Connexus Energy Tower would provide benefit to a majority of the City's residents, as <br />Connexus Energy provides electric service to a majority of the community, as well as a larger geographic area <br />surrounding its headquarters. <br />In 2008, the City amended City Code standards related to telecommunications towers. Concerns had been raised <br />due to the construction of a tower located in Alpine Park providing mobile phone coverage to the area. The policy <br />direction from that ordinance was to lower the maximum height of telecommunications towers to 100 feet and <br />adjust which locations are suitable for said towers. Per the Federal Telecommunications Act, the City cannot restrict <br />all locations within the City from construction of telecommunications towers. The City can, however, provide <br />restrictions on location and design standards. Many similar communities allow maximum height ranges of 100 feet <br />to 150 feet. <br />The proposed tower would be the second tallest structure in the community, second to an existing radio tower on <br />Bunker Lake Boulevard near Saint Francis Boulevard which is approximately 300 feet in height. <br />Staff has met with representatives of Connexus Energy to discuss the proposal. Staff has discussed the potential to <br />co -locate on other existing towers in the area, and will continue these discussions moving forward to ensure that all <br />alternatives have been exhausted before moving forward with a new, separate tower. <br />Funding Source: <br />This case is being handled as part of normal Staff duties. If a land use application is submitted, all costs associated <br />with processing said Application are the responsibility of the Applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.