My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/08/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 01/08/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:22 AM
Creation date
1/15/2015 12:12:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/08/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{§11 -liKdn. <br />(a) Sketch plan. Prior to dividing any tract of land, the subdivider shall submit a sketch plan for review by <br />the planning commissionzoninq administrator. At the time of submission of the sketch plan, the <br />subdivider of the land covered by the sketch plan shall submit a petition for rezoning to the proposed <br />use of said land, if the land is not already so zoned. The owner of said land shall join in said petition. <br />administrator at least 30 calendar days before the next regular monthly meeting of the planning <br />commission at which meeting said sketch plan shall be considered. <br />individuals. <br />(3) The city staff review letter shall be submitted to the planning commission and shall state whether <br />the sketch plan and the improvements conform to the engineering and design standards and <br />tents of this Code. <br />('I) The planning commission shall consider the sketch plan, the city staff review letter and any other <br />pertinent information that they may wish to consider. The planning commission shall advise the <br />subdivider of the extent to which the plan conforms to the requirements of the community and the <br />ability of the city to provide essential services and may discuss possible modifications necessary <br />to secure approval of the subdivision. <br />(b) Sketch plan data required. It shall be a condition to the approval of a sketch plan that the following <br />data shall be shown on said plat or shall be furnished therewith: Required sketch plan data. <br />(1) Name of subdivision, which name shall not duplicate any plat already recorded in the county. <br />(2) Full legal description of the land involved in said plat. <br />(3) Names and addresses of the owner and subdivider of the land, and the designer and surveyor of <br />said plat. <br />(4) Graphic scale of not more than one inch to 100 feet. <br />(5) Date and north point. <br />(6) Boundary line survey, including measured distances and angles, which shall be tied into the <br />nearest quarter section or section line by traverse and certified by a registered land surveyor. <br />(7) Total acreage and square feet of project area. <br />(8) Location and names of existing or platted streets and other public ways, parks and public open <br />spaces, permanent buildings and structures, easements and section and municipal boundary <br />lines within the plat and to a distance of 100 feet beyond. <br />(9) Identify all wetlands on the property. <br />(10) Locations and widths of public right-of-way, public and private streets and pedestrian trails and <br />sidewalks. <br />(11) Other areas intended to be dedicated or reserved for public use, including the size of such areas. <br />(12) If residential, state type, number of dwelling units, and approximate net density (excluding major <br />road rights-of-way and wetlands). <br />(13) Additional information as requested by staff. <br />(c) Final plat. <br />(1) Following approval of the sketch plan by the planning commissionzoninq administrator, the zoning <br />administrator shall promptly notify the subdivider of said approval. Withinwithin one year following <br />approval of the sketch plan, the subdivider shall submit the final plat to the zoning administrator. <br />Thereafter, the council may extend the period upon written application by the subdivider and <br />
The URL can be used to link to this page
Your browser does not support the video tag.