Laserfiche WebLink
Review File: BROOKFIELD 5TH ADDITION <br />Sketch Plan/Preliminary Plat Request <br />January 2, 2015 <br />Page 3 of 3 <br />Sketch Plan does indicate ten (10) coniferous trees planted in a staggered row along the south property line. <br />The quantity of plantings is consistent with plantings provided on the lot directly west of the Property <br />(closer to the home on the Adjacent Parcel) and thus, this seems reasonable. The plantings are also shown <br />within a proposed Landscape Easement to protect against removal in the future. <br />At the time of Final Plat submittal, a detailed Landscape Plan (including species, root type, size and <br />planting detail) and Landscape Easement description (including restrictions/conditions) shall be provided <br />for review and approval by the City. The Landscape Easement will need to be recorded against the <br />Property. <br />Easements: With the Final Plat Application, Staff will be reviewing compliance with the standard <br />requirements for drainage and utility easement dedication. Drainage and utility easements must be ten (10) <br />feet in width abutting dedicated right-of-way, five (5) feet in width along both side lot lines, and encumber <br />any 100 -year flood zone for all existing and proposed surface waters and wetlands. The Sketch Plan does <br />provide a forty-five (45) foot drainage and utility easement in the rear of the property encumbering the <br />existing berm, which does address a concern that had previously been raised. <br />The existing drainage and utility easements on Outlot F will need to be vacated through an Application for <br />Easement Vacation. <br />Utilities: Municipal Water and Sanitary Sewer have been extended to the Property. The Applicant will be <br />responsible for applicable connection fees to be outlined during the Final Plat Review. <br />Other Development Fees. The Applicant will also be responsible for Park Dedication, Trail Development, <br />and Stormwater Management Fees. A full analysis of applicable development fees will be provided with <br />the Final Plat Review. <br />Miscellaneous. Should this plat be approved, it would not preclude the future extension of Feldspar St. <br />Thus, the cul de sac should be signed as a potential future through street. Additionally, the existing sidewalk <br />along Feldspar St, which currently terminates at or near the north boundary of the proposed plat, would be <br />extended in front of the Property should Feldspar St ever be extended. The Development Agreement, which <br />will be prepared as part of the Final Plat review process, will have language addressing both of these points. <br />As the cul de sac was initially intended to be temporary, the `wing' was only constructed with the base <br />course of asphalt. There is concern that the heavy equipment used in the construction of the home may <br />damage this portion of asphalt. Thus, to ensure that the cul de sac `wing' post construction is in the same <br />condition as its pre -construction state, either an escrow (returned after construction is complete AND cul <br />de sac wing inspected by City Staff to confirm no damage) should be provided and/or there will be language <br />in the Development Agreement that would require its replacement if damaged through the construction <br />process prior to issuance of a Certificate of Occupancy. <br />