Laserfiche WebLink
INTRODUCTION <br />The 2015 Street Improvements include improvements on multiple streets throughout the City. Different <br />pavement management procedures are proposed to be utilized on each street, depending on the existing <br />condition of the street. Each street was reviewed by Bolton & Menk and City Staff to determine the <br />procedure that would be applied to it. Each procedure is described below, along with the street that is <br />scheduled for that type of procedure. <br />Edge Mill and Overlay <br />Edgc Mill and Overlay of a roadway consists of milling the existing bituminous along the existing gutter <br />or bituminous edge in order to match the new overlay to the existing elevations. Areas of roadway will <br />also be Milled and Overlayed, this consists of milling the existing bituminous surface along the roadway <br />to a uniform depth and overlaying bituminous on the remaining pavement. The streets proposed to be <br />edge milled and overlayed are in fair condition. The proposed Edge Mill and Overlay improvements are <br />shown on Figure No. 1 and 2 in Appendix A. <br />The following streets are proposed to be edge milled and overlayed: <br />• School Street NW (Proctor Avenue NW to TH 169) <br />• 8th Street NW (Dodge Avenue NW to Cul-de-Sac) <br />• Tyler Street Area — 197th Avenue NW (Evans Street NW to Dodge Street NW), 198th Avenue <br />NW (Dodge Street NW to Zane Street NW), 197th Avenue NW (Zane Street NW to Tyler Street <br />NW), 200th Avenue NW (Cul-de-Sac to Tyler Street NW), Vance Circle NW, Vance Street NW <br />(Vance Circle to Ulysses Street NW), Ulysses Street NW (South Cul-de-Sac to 202nd Avenue <br />NW), 195th Avenue NW (Ulysses Street NW to Tyler Street NW), Tyler Street NW (197th <br />Avenue NW to 201st Circle NW), 201st Circle NW, 203rd Avenue NW (Smith Street NW to <br />560-feet cast of Quincy Circle NW), Quincy Circle NW <br />Reclamation <br />Reclaiming of bituminous pavement is a process whereby the pavement and underlying aggregate base <br />are milled together in -place, regraded and compacted as base material for the new pavement overlay. The <br />new pavement section shall be a 9-Ton design and shall consist of 3.5-inches of bituminous pavement <br />with 8-inches of aggregate base. The streets proposed to be reclaimed are in poor condition. The proposed <br />reclamation improvements are shown on Figure No. 2 in Appendix A. <br />The following streets are proposed to be reclaimed: <br />• Elk Hills Area— Elk Hills Drive NW, Fawn Road NW, Line Avenue NW, and 700-feet of Elk <br />Lanc NW bcginning at Elk Hills Drive <br />• Tyler Street Arca — Tyler Street NW (Twin Lakes Road to 197th Avcnuc NW), Smith Street NW <br />(201st Circle NW to 205th Avenue NW), 202nd Avenue NW (Smith Street NW to Ulysses Street <br />NW), Ulysses Street NW (202nd Avcnuc NW to Vance Street NW, Vance Street NW (Vance <br />Circle NW to 205th Avenue NW) <br />City of Elk River <br />2015 Street and Utility Improvements <br />INTRODUCTION <br />Page 4 <br />