My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/20/2015
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2015
>
Agenda - Public Works Committee - 01/20/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:43:23 AM
Creation date
1/21/2015 2:09:23 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
165TH AVENUE NW & JARVIS STREET NW - NO TRAIL OPTION <br />PRELIMINARY COST ESTIMATE <br />STA. 12+48 TO STA. 139+10 <br />CITY OF ELK RIVER <br />NO. <br />ITEM UNITS QTV UNIT PRICE TOTAL PRICE <br />RAILROAD CROSSING IMPROVEMENTS AT 165TH AVENUE & JARVIS STREET <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />PROPOSED CROSSING SURFACE (INCLUDES CONCRETE PANELS, NEW RAIL, TIES, AND BALLAST) LF 128 $1,400.00 $179,200.00 <br />PROPOSED SAFETY MEASURE (TWO -QUADRANT GATE SYSTEM WITH FLASHERS & CWT) LUMP SUM 2 $250,000.00 $500,000.00 <br />COMMON EXCAVATION CU YD 300 $14.00 $4,200.00 <br />AGGREGATE BASE CLASS 5 TON 160 $28.00 $4,480.00 <br />5" CONCRETE WALK SQ FT 0 $6.00 $0.00 <br />CONCRETE CURB & GUTTER DESIGN B818 (NON -TRAVERSABLE MEDIAN) LIN FT 640 $18.00 $11,520.00 <br />TRUNCATED DOMES SQ FT 0 $42.00 $0.00 <br />FLAG PERSON (BNSF CROSSING) LUMP SUM 2 $12,500.00 $25,000.00 <br />SIGN PANEL TYPE C SQ FT 100 $35.00 $3,500.00 <br />HYDRAULIC SOIL STABILIZER, TYPE 5, WITH SEED & FERT. SQ YD 1000 $2.00 $2,000.00 <br />SUBTOTAL QUIET ZONE COST $729,900.00 <br />10% CONTINGENCIES $73,000.00 <br />TOTAL QUIET ZONE COST $802,900.00 <br />INDIRECT COSTS (10%) $80,300.00 <br />TOTAL QUIET ZONE COST $883,200.00 <br />TOTAL PROJECT COST $3,795,400.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.