Laserfiche WebLink
165TH AVENUE NW & JARVIS STREET NW - NO TRAIL OPTION <br />PRELIMINARY COST ESTIMATE <br />STA. 12+48 TO STA. 139+10 <br />CITY OF ELK RIVER <br />NO. <br />ITEM UNITS QTV UNIT PRICE TOTAL PRICE <br />RAILROAD CROSSING IMPROVEMENTS AT 165TH AVENUE & JARVIS STREET <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />PROPOSED CROSSING SURFACE (INCLUDES CONCRETE PANELS, NEW RAIL, TIES, AND BALLAST) LF 128 $1,400.00 $179,200.00 <br />PROPOSED SAFETY MEASURE (TWO -QUADRANT GATE SYSTEM WITH FLASHERS & CWT) LUMP SUM 2 $250,000.00 $500,000.00 <br />COMMON EXCAVATION CU YD 300 $14.00 $4,200.00 <br />AGGREGATE BASE CLASS 5 TON 160 $28.00 $4,480.00 <br />5" CONCRETE WALK SQ FT 0 $6.00 $0.00 <br />CONCRETE CURB & GUTTER DESIGN B818 (NON -TRAVERSABLE MEDIAN) LIN FT 640 $18.00 $11,520.00 <br />TRUNCATED DOMES SQ FT 0 $42.00 $0.00 <br />FLAG PERSON (BNSF CROSSING) LUMP SUM 2 $12,500.00 $25,000.00 <br />SIGN PANEL TYPE C SQ FT 100 $35.00 $3,500.00 <br />HYDRAULIC SOIL STABILIZER, TYPE 5, WITH SEED & FERT. SQ YD 1000 $2.00 $2,000.00 <br />SUBTOTAL QUIET ZONE COST $729,900.00 <br />10% CONTINGENCIES $73,000.00 <br />TOTAL QUIET ZONE COST $802,900.00 <br />INDIRECT COSTS (10%) $80,300.00 <br />TOTAL QUIET ZONE COST $883,200.00 <br />TOTAL PROJECT COST $3,795,400.00 <br />