Laserfiche WebLink
Public Works Committee 5. 2. <br />Meeting Date: 01/20/2015 <br />By: Chris Anderson, Community <br />Development <br />Title: <br />Consider Planning Commission Recommendation to Reconstruct a Temporary Cul-De-Sac on Feldspar Street in the <br />Brookfield Subdivision <br />Purpose/Background: <br />21st Century Bank (the "Applicant") has submitted an application for Sketch Plan and Preliminary Plat for a <br />proposed minor plat known as Brookfield 5th Addition. The minor subdivision proposes to re -plat approximately <br />0.31 acres to create one (1) buildable single-family lot. The proposed plat would not re -configure existing property <br />lines, other than to encumber the existing cul-de-sac within right of way. The proposed plat would convert an <br />existing outlot to a buildable lot (the "Property"). By definition, an outlot is an undeveloped area set aside for future <br />development, at which time review of the feasibility and payment of development fees occur. The Property is <br />generally located west of Nowthen Boulevard (CSAH 5) at the terminus of Feldspar Street and would gain access <br />via an existing cul-de-sac constructed to temporary road standards. <br />At their January 8, 2015 meeting, the Planning Commission conducted a Public Hearing regarding this proposed <br />plat. At least one (1) property owner adjacent to the cul-de-sac expressed concern with the existing conditions of <br />the cul-de-sac. Previously, multiple property owners had expressed the same. The Planning Commission also <br />expressed concern with the temporary cul-de-sac due to how it was originally constructed in a temporary fashion. <br />The Planning Commission recommended that the City upgrade it to current construction standards within its <br />existing footprint. <br />Timeframe: <br />30 minutes <br />Observations/Alternatives: <br />When BROOKFIELD 1ST ADD was approved, it was anticipated that the extension of Feldspar Street further <br />south would occur in the near future to accommodate redevelopment of those larger, existing lots. Thus, the 'wings' <br />of the cul de sac were designed and constructed to meet the standard of a temporary road, which does not include <br />curb and gutter and only required a two (2) inch lift of bituminous pavement (note that Feldspar St does have curb <br />and gutter through the center of the cul-de-sac, but the 'wings' do not). Those improvements were constructed in <br />2007 and signs of deterioration are beginning to emerge. It is also noted that the current configuration of curb and <br />gutter creates maintenance issues for our Public Works Department during snow removal. <br />The owner of the adjacent parcel to the south has stated on multiple occasions, and again at the Public Hearing on <br />January 8, 2015, that he he has no intention of selling or subdividing the adjacent parcel for the foreseeable future <br />and also noted as such as part of the original review process of Brookfield in the past. <br />Furthermore, there is lowland in the rear yards of Lots 2 & 3, Block 3, Now and Then Estates that would further <br />complicate the potential extension of Feldspar Street. While together these don't completely eliminate the <br />possibility of future redevelopment and the extension of Feldspar Street, it certainly appears that it won't occur in <br />the near future. Based on the unlikely development potential of the property to the south, at least based on <br />information available at present time, the general sense is that this cul-de-sac is truly a 'permanent' cul-de-sac and <br />that it should be reconstructed in accordance with the subdivision design standards of Chapter 117, Article III. <br />The cul-de-sac is currently encumbered with a Temporary Road Easement across portions of Lot 12, Block 2, Lot 1 <br />