Laserfiche WebLink
I <br />I <br />I <br /> <br />20. <br /> <br />zl. <br />24. <br /> <br />,I <br />,I <br /> <br />I <br />I <br />I <br />I <br /> <br />ATTACiiMENT #2 <br /> <br />SUMMARY OF ISSUES <br /> <br />'l']m City of RamSey will be installing a municipal water system starting with 1 or <br /> wells located in Ithe Southeastern corner of the City (see County map) and a <br />i)NR t)ermit will be required. <br /> <br />l)ewatering' will take place during construction and disposed of into a retention <br />pond (see site-lphm for location of retention pond). <br /> <br />I)ul'i{~' cot{struction dewatcring may affect ground water levels in surrounding <br />well:~. Ii' {his imPpens it will be the responsibility o1' lhe utility contm~ctov to <br />t,r~vi(]c sul'l'i~i~nt ~watep to the owners of the atTectcd wells. After construction <br />a~d ~lew;~iering is~stopped, g'round water levels will return to normal. <br /> <br />l)u.~t co,~t,'ol ii{east~res will be taken during construction and tim equipment will <br />i)e ot)er;~tcd o~dy during the hours of daylight. <br /> <br /> <br />