Door Schedule
<br />No.
<br />DOOR
<br />S 17 Thick' Type Mar -44 FInlsh
<br />FRAME
<br />Tye [W.] MaterIA Finish
<br />1 1ARf)WARF
<br />CorrponRnts Kay Skin
<br />MOTFS
<br />FLOORING PREP: GENERAL CONTRACTOR TO CHECK CONCRETE
<br />NO.
<br />NAME
<br />FLOOR
<br />BASE
<br />WALLS
<br />GENERAL REMARKS
<br />2.
<br />BRONZE CAULK APPLIED TO ALL EXTERIOR DOORS.
<br />CL
<br />CLOSER, SURFACE MOUNTED (VERIFY SIDE)
<br />1
<br />COVERINGS DATE,
<br />MOISTURE TESTING - A MAT MOISTURE TEST IS AN EFFICIENT
<br />I 1/1313
<br />M+3RTISC I IINGCS, 4 x 4 2. (SALE UCARIMG 2 PAIR PCR ❑OCR
<br />.1
<br />FIMI SI I
<br />MATFRIAI
<br />K
<br />108.1 (FRONT)
<br />PR 3' -D" x T' -0"
<br />MOISTURE TESTING METHOD FOR CONCRETE SLAB. SIMPLY PLACE A
<br />ALUMINUM
<br />FAU I ORY
<br />_4 1/2
<br />ALUMINUM
<br />I I OKY
<br />op, fi, PI I, S
<br />(D
<br />MWS
<br />MAGNETIC WEATHER ST SWEEP
<br />ALL WALLS
<br />FLOOR IN AN AREA THAT IS LIKELY TO BE WET (TEST LARGE SITES IN
<br />�
<br />O
<br />ALL SURFAC LS I HA I ARE I U BE FAIN I ED ARE I O L E CaLEANLD WI I H
<br />0P
<br />z
<br />Q
<br />Z
<br />NUI ES
<br />m
<br />oC
<br />�
<br />L}
<br />z
<br />O
<br />Z
<br />NO I E6
<br />IL
<br />Q_
<br />�
<br />LL
<br />O
<br />z
<br />G]
<br />Z
<br />w
<br />M
<br />m
<br />C
<br />-
<br />L..
<br />C
<br />NOI ES
<br />102.1 (MANAGERS OFFICE)
<br />3' - x 6'-3" (;3068) 1 3/4"
<br />A
<br />SC WO
<br />STAIN RH
<br />1 4 5/8
<br />STEEL BREAK DOWN
<br />FACTORY
<br />SH, LS, WS, K
<br />PP
<br />0 4O T S ;
<br />103.1 (KITCHEN}
<br />KITCHEN HALF CAFE DOOR
<br />D
<br />ALUM, & VINYL
<br />BLACK
<br />1 DBL. SWING
<br />DOOR [MODEL -CHASE
<br />8 R 50'001. SET BOTTOM
<br />HINGE 6 112" FROM FLOOR.
<br />•
<br />103.2 ( EXTERIOR KITCHEN)
<br />3'-G" x 7' -0" (3678) 1 3/4"
<br />B
<br />STEEL
<br />PAINT RH
<br />1 _iC 1/4 "1
<br />HOLLOW METAL
<br />PAINT
<br />H /BB, CL, K, MWS, LL
<br />SH
<br />4O fi T CB
<br />10C}
<br />SALES AREA
<br />•
<br />•
<br />WS
<br />WALL STOP
<br />•
<br />•
<br />W1
<br />105.1 (BACK ROOM)
<br />3' -0" x 6' -W (3868) V.
<br />C
<br />ABS PLASTIC
<br />FACTORY
<br />1 - 41/2 - 1
<br />WOOD
<br />STAIN
<br />HARDWARE BY DOOR SUPPLIER
<br />3 4 T S
<br />101
<br />SALES COUNTER
<br />•
<br />SOLUTION. ALLOW SOLUTION TO DRY COMPLETELY. DO NOT RINSE
<br />CORE WITH PLAIN SLICED CHERRY VENEER, SOLID WOOD EDGES, LIFETIME
<br />•
<br />CONCRETE AFTER APPLYING THE SOLUTION.
<br />•
<br />WARRANTY.
<br />HARDWARE FINISH; US3.
<br />•
<br />BOTH TH E GENERAL AND FLOORING CONTRACTOR TO COORDINATE
<br />W2
<br />PI dC3VIL}E MALti` I EF2 KEY FO Ft LO{iKSE I S AND {:OL}I - ZDINA I E KEYING WI I H OWNER.
<br />110.1 (C:(JSTO ❑IAN)
<br />3' -0" x G' -0" (306(3) 1 3/4"
<br />A
<br />SC WOOD
<br />STAIN LH
<br />1 _4 112"1
<br />STEEL BREAK DOWN
<br />FACTORY
<br />SH, LS, WS, K
<br />D ®
<br />102
<br />MANAGER'S OFFICE
<br />•
<br />1.4
<br />FLOORING CONTRACTOR IS TO TAKE ALL APPROPRIATE TESTS
<br />•
<br />O
<br />HARD PLASTIC DOORS! 1"x 16 GaA. WITH SOLID WOOD CORE. MEDIUM TRAFFIC
<br />W3
<br />CONTAMINANTS. THE APPLIED ADHESIVE MUST DEVELOP "LEGS" OR
<br />111.1 (END - EXTERIOR)'
<br />X-6" x 7' -0" (3678) 1 3/4"
<br />B
<br />STEEL
<br />PAINT LH
<br />1 A 0 1/4 "]
<br />HOLLOW METAL
<br />PAINT
<br />H /BB. CL. PD. K. MWS
<br />U U V
<br />103
<br />KII UHEN
<br />PAINT COAT. TWO 2] FINISH PAINT COATS, ,: DARK RRD"7F KAVVNFFR #40.
<br />•
<br />" DR ABOVE UNTIL STORE OPENING.
<br />ALUMINUM/GLASS DOORS: KAWNEER 198 NARROW STILE ENTRANCE WITH 451
<br />•
<br />2
<br />FLOOR CARE PROCEDURE: AFTER THE FLOOR TILE IS LAID, ALLOW A
<br />•
<br />V1/3
<br />0
<br />112.1 (MEN'S RESTROOM)
<br />X -0" x 6' ( 1 3 //l"
<br />A
<br />SC WOOD
<br />STAIN I H
<br />1 A 3M
<br />STEEL BREAK DOWN
<br />FACTORY
<br />PP, CL, K. VVS, FS
<br />O <4) 7 8 ®
<br />104
<br />WALK4N FREEZER
<br />ENTERS THE STORE DURING THE 72 HOUR DRYING TIME.
<br />O
<br />2.1
<br />131
<br />INTERIOR]
<br />•
<br />2.2
<br />AFTER T2 HOURS, CONTRACTOR IS TO COVER EVERY INCH OF ENTIRE
<br />113.1 (WOMEN'S RESTROOM'
<br />X.0" x Fi'.R" (3868) 1 7, 4"
<br />A
<br />SG, WOOD
<br />.STAIN RI 1
<br />1 _43/4
<br />S I EEL BREAK DOWN
<br />FAC I OKY
<br />PP, CL, K. WS, FS
<br />ARMSTRONG PAPER AND TAPING THE SEAMS, DO NOT TAPE ANY
<br />� � � 7 $ �
<br />105
<br />BACKROOM
<br />EDGES! HIGH TRAFFIC AREAS SHOULD BE DOUBLE THICKNESS, WORN
<br />AREAS SHOULD BE REPAIRED AS NEEDED.
<br />®
<br />ADD 5/9" TO R0I JGI I OPENING FOR DOOR TO AI I nw FOR TII r rI 00R FIN191 1.
<br />2.3
<br />CONTRACTOR WILL GUT (BE CAREFUL AND REMOVE PAPER TO
<br />HC3LD )AML S 5/8" OFF c�C7N. SUB-F LL}OR AS F2E(p'L7, FUR d I IL INt:I ALLA I ION.
<br />INSTALL CABINETS, EQUIPMENT, AMCO WIRE SHEVLING, STAINLESS
<br />STEEL TABLES. NO PAPER SHOULD BE LEFT UNDER ANY SET
<br />J
<br />RESTROOM DOOR FRAMES TO BE INSTALLED PRIOR TO FLOOR TILE BEING
<br />106
<br />WALK4M FREEZER
<br />EQUIPMEN I ,
<br />INSTALLED.
<br />L
<br />2.4
<br />CONTRACTOR SHALL HAVE A GARBAGE DUMPSTER AVAILABLE
<br />B1
<br />AC_C:CIRUING 10 UASEY'S SPECsIFICA I IONS MANUAL "-�3ENEHAL
<br />REQUIREMENTS, PAGE 1 -6, SECTION 5, ITEM "E ".
<br />2.5
<br />CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL REMAINING
<br />107
<br />WALK4M COOLER
<br />PAPER PRIOR TO CASEY'S STORE SET INSTALLING LOZIER SHELVING.
<br />•
<br />3
<br />MATERIAL SUPPLIED AND SHIPPED BY CASEY'S ON FIRST LOAD:
<br />3.1
<br />5 -ROLLS ARMSTRONG (S -153) SCRIBING FELT PAPER 36" x 50 YARDS
<br />Wi
<br />EACH.
<br />3.2
<br />6-ROLLS NATURAL (CP083) CREPE MASKING TAPE 11 -112" x 130 YARDS
<br />109
<br />STORAGE ROOM
<br />•
<br />VARNISH ALL WOOD TRIM III
<br />UVi
<br />110
<br />CUSTODIAN ROOM
<br />•
<br />0
<br />03
<br />'111
<br />HALL
<br />•
<br />•
<br />•
<br />117
<br />WnMFNS' RFSTFZOnM
<br />•
<br />0
<br />•
<br />•
<br />0
<br />N4
<br />113
<br />MENS' RESTROOM
<br />•
<br />•
<br />•
<br />W4
<br />114
<br />WALK4N COOLER
<br />•
<br />•
<br />W1
<br />General Door Schedule Notes
<br />Hardware Key and Notes:
<br />Room Finish Schedule
<br />General Finishes Notes
<br />1.
<br />SEE SHEET A -181 FOR FLOOR PLAN AMD DOOR LOCATIONS.
<br />AG
<br />ACOUSTIC GASKETS [HEAD /.JAMB]
<br />1
<br />FLOORING PREP: GENERAL CONTRACTOR TO CHECK CONCRETE
<br />son
<br />see
<br />C
<br />RIM CYLINDER
<br />FLOOR SLAB FOR MOISTURE TWO WEEKS PRIOR TO FLOOR
<br />2.
<br />BRONZE CAULK APPLIED TO ALL EXTERIOR DOORS.
<br />CL
<br />CLOSER, SURFACE MOUNTED (VERIFY SIDE)
<br />1
<br />COVERINGS DATE,
<br />MOISTURE TESTING - A MAT MOISTURE TEST IS AN EFFICIENT
<br />I 1/1313
<br />M+3RTISC I IINGCS, 4 x 4 2. (SALE UCARIMG 2 PAIR PCR ❑OCR
<br />.1
<br />3.
<br />CONTRACTOR IS TO INSTALL A FINAL COAT OF VARNISH ON ALL TRIM AND
<br />K
<br />KICK PLATE
<br />MOISTURE TESTING METHOD FOR CONCRETE SLAB. SIMPLY PLACE A
<br />JAMBS
<br />I S
<br />I C]G:K srT, C'C}MMrRfiIAI G� RAf }r [SC'I II AfiF]
<br />GRADI
<br />18 "x1 c3" I ICAVY, CLEAR GAUGE PQLYCTI IYLCNC S ICCTING ON TI IC
<br />MWS
<br />MAGNETIC WEATHER ST SWEEP
<br />FLOOR IN AN AREA THAT IS LIKELY TO BE WET (TEST LARGE SITES IN
<br />4,
<br />ALL SURFAC LS I HA I ARE I U BE FAIN I ED ARE I O L E CaLEANLD WI I H
<br />0P
<br />OFFSFT PIVOTS
<br />R
<br />S 1 TI I r Pr Gtr TI IF
<br />ATIG7NS).
<br />APPROPRIATI CI FANrRS PRIOR TO PAINTING.
<br />PB
<br />PANIC BAR a 38" AFF
<br />S S S O THAT NO AIR IR CAN PEN ETRAT E E AND LEAV E IN N
<br />PH
<br />KAWNEER #C-89 PULL HANDLES
<br />FOR 24 HOURS, THEN REMOVE THE PIECE(S) AND EXAMINE THE HE F FACE,
<br />S.
<br />INSTALL DOUBLE WALL STUDS AT ALL DOOR..AMBS,
<br />PL
<br />PASSAGE LOCK
<br />IF WATER DROPS ARE PRESENT, EXCESSIVE MOISTURE EXISTS AND
<br />PP
<br />PULL/PU LL PLATE AND PUSH PLATE - INSTALL OPEN END DOWN
<br />THE CONCRETE MUST DRY LONGER, MOISTURE TESTS SUCH AS
<br />OHMMETER RESISTANCE, CALCIUM CHLORIDE, ETC., ARE ALSO
<br />•
<br />REESE 9670.36" SWEEP
<br />D oo r Sc
<br />Notes
<br />SH
<br />SPRING HINGES
<br />1.2
<br />ACCEPTABLE,
<br />ALKALI TE STIN G -AFTER MOISTURE TESTING, IT IS MAN DATORYTO
<br />WS
<br />WALL STOP
<br />TEST FOR ALKALINITY. USE PH STRIPS WiDISTILLED WATER 5-9 SCALE
<br />FS
<br />LL
<br />FLOOR STOP
<br />LOCKSET - LEVER TYPE
<br />ARE ACCEPTED. NOT TO BE UNDER 5 OR OVER 9. TO NEUTRALIZE. IM GP
<br />THE SURFACE OF THE CONCRETE WITH A 18 % MURACTIC ACID
<br />U 1
<br />PAINT FINISH WOOD DOORS: PREMIUM GRADE, 7 -PLY SOLID PARTICLEBOARD
<br />SOLUTION. ALLOW SOLUTION TO DRY COMPLETELY. DO NOT RINSE
<br />CORE WITH PLAIN SLICED CHERRY VENEER, SOLID WOOD EDGES, LIFETIME
<br />CONCRETE AFTER APPLYING THE SOLUTION.
<br />WARRANTY.
<br />HARDWARE FINISH; US3.
<br />1.3
<br />BOTH TH E GENERAL AND FLOORING CONTRACTOR TO COORDINATE
<br />PI dC3VIL}E MALti` I EF2 KEY FO Ft LO{iKSE I S AND {:OL}I - ZDINA I E KEYING WI I H OWNER.
<br />O
<br />HOLLOW METAL DOORS: 1 3/4" x 18 GA.. FULL FLUSH PANEL. PRIME PAINT
<br />S U BMIT HARDWARE SCHEDULE AND PRODUCT DATA TO OWNER FOR
<br />THE CONDITION OF THE CONCRETE FLOOR SLAB TO DETERMINE IT'S
<br />TI
<br />D BE
<br />COAT, FACTORY PAINTED, DARK BRONZE KAWNEER #40.
<br />F2EVIEW /AF'I'ROVAL,
<br />SUITABILITY A SUBSTRATE FOR FLOOR MATERIAL INSTALLED.
<br />1.4
<br />FLOORING CONTRACTOR IS TO TAKE ALL APPROPRIATE TESTS
<br />BEFORE LAYING TILE. FLOOR IS TO 13C DRY AND FREE FROM
<br />O
<br />HARD PLASTIC DOORS! 1"x 16 GaA. WITH SOLID WOOD CORE. MEDIUM TRAFFIC
<br />CONTAMINANTS. THE APPLIED ADHESIVE MUST DEVELOP "LEGS" OR
<br />DC3OR WI I H DOUB LE-AU I ING VYING. 9" x 14" WINDOW, DOOR 105.1 ONLY:
<br />TArK PRIOR 70 APPI YING 711 F.
<br />STEEL BREAKDOWN FRAMES' 2" x 16 GA.. SNAP ON TRIM BOTH SIDES. PRIME
<br />1.5
<br />48 - 72 HOURS BEFORE INSTALLATION. THE TEMPERATURE MUST BE 70
<br />PAINT COAT. TWO 2] FINISH PAINT COATS, ,: DARK RRD"7F KAVVNFFR #40.
<br />" DR ABOVE UNTIL STORE OPENING.
<br />ALUMINUM/GLASS DOORS: KAWNEER 198 NARROW STILE ENTRANCE WITH 451
<br />2
<br />FLOOR CARE PROCEDURE: AFTER THE FLOOR TILE IS LAID, ALLOW A
<br />MINIMUM OF 72 HOURS DRYING TIME FOR THE GLUE TO CURE. IT IS
<br />TRANSOM FRAME. # DARK BRONZE ANODIZED FINISH WITH 1" BRONZE TINTED
<br />THE GENERAL CONTRACTOR'S RESPONSIBILITY TO SEE NO ONE
<br />INSULATED GLASS, DOORS TO HAVE 17" KICK PLATE,
<br />ENTERS THE STORE DURING THE 72 HOUR DRYING TIME.
<br />CONTRACTOR TO INSTALL, CLEAN. AND INSULATE FRAMES. [EXTERIOR &
<br />2.1
<br />DUST MOP GLEAN THE ENTIRE FLOOR.
<br />INTERIOR]
<br />2.2
<br />AFTER T2 HOURS, CONTRACTOR IS TO COVER EVERY INCH OF ENTIRE
<br />FLOOR IN ALL ROOMS. EXCEPT UTILITY ROOM. COVER WITH
<br />O TOP
<br />HINGE TO BE ANCHORED INTO STUD WITH LONG SCREWS. SUPPLIED BY
<br />ARMSTRONG PAPER AND TAPING THE SEAMS, DO NOT TAPE ANY
<br />OWNER, IF APPLICABLE.
<br />EDGES! HIGH TRAFFIC AREAS SHOULD BE DOUBLE THICKNESS, WORN
<br />AREAS SHOULD BE REPAIRED AS NEEDED.
<br />®
<br />ADD 5/9" TO R0I JGI I OPENING FOR DOOR TO AI I nw FOR TII r rI 00R FIN191 1.
<br />2.3
<br />CONTRACTOR WILL GUT (BE CAREFUL AND REMOVE PAPER TO
<br />HC3LD )AML S 5/8" OFF c�C7N. SUB-F LL}OR AS F2E(p'L7, FUR d I IL INt:I ALLA I ION.
<br />INSTALL CABINETS, EQUIPMENT, AMCO WIRE SHEVLING, STAINLESS
<br />STEEL TABLES. NO PAPER SHOULD BE LEFT UNDER ANY SET
<br />J
<br />RESTROOM DOOR FRAMES TO BE INSTALLED PRIOR TO FLOOR TILE BEING
<br />EQUIPMEN I ,
<br />INSTALLED.
<br />2.4
<br />CONTRACTOR SHALL HAVE A GARBAGE DUMPSTER AVAILABLE
<br />AC_C:CIRUING 10 UASEY'S SPECsIFICA I IONS MANUAL "-�3ENEHAL
<br />REQUIREMENTS, PAGE 1 -6, SECTION 5, ITEM "E ".
<br />2.5
<br />CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL REMAINING
<br />PAPER PRIOR TO CASEY'S STORE SET INSTALLING LOZIER SHELVING.
<br />3
<br />MATERIAL SUPPLIED AND SHIPPED BY CASEY'S ON FIRST LOAD:
<br />3.1
<br />5 -ROLLS ARMSTRONG (S -153) SCRIBING FELT PAPER 36" x 50 YARDS
<br />EACH.
<br />3.2
<br />6-ROLLS NATURAL (CP083) CREPE MASKING TAPE 11 -112" x 130 YARDS
<br />EACH.
<br />VARNISH ALL WOOD TRIM III
<br />INSTALL FRONT DOOR &
<br />WINDOWS (B} FIRST. TO INSURE
<br />WINDOWS (A) ARE AT SAME LEVEL
<br />TIGI IT TO
<br />I OP OF
<br />DOOR FRAMF
<br />H
<br />C7 J Li
<br />w
<br />y d LL
<br />LL
<br />U)
<br />2" DOOR W 2"
<br />KNOCK - DOWN HOLLOW
<br />METAL FRAME
<br />O
<br />(:3:) Frame Typ
<br />1 /4 = 1 ' -D"
<br />SCHED
<br />STEEL W/ SOLID
<br />WOOD CORE
<br />O
<br />Door T,
<br />1 A = 1 '_Q"
<br />s
<br />SCHED
<br />17" x 1 ii" CI FAR
<br />PIJ LYCARBC) NA I E
<br />WIMDr1W ,FT IN
<br />BLACK RUBBER
<br />MOLDING
<br />26" x 40" FLUSH
<br />KICK PLATE
<br />JJ /
<br />0
<br />\
<br />DOUBLE ACTING
<br />SERVICE DOOR
<br />O
<br />DOUBLE ACTING
<br />KITCH EN DOOR
<br />O
<br />6' -7.5" R O
<br />so N.•
<br />Door ' 017.1
<br />O
<br />16' -1 112" R O
<br />4 FQ1JAI GI AS WIIOTHS
<br />•t•
<br />•t•
<br />000
<br />W
<br />000
<br />000
<br />son
<br />see
<br />(BOTH SIDES OF DOOR 100.1)
<br />4 FIBERGLASS REINFORCED PLASTIC (FRP) CARE AND PROCEDURE:
<br />CONTRACTOR TO FOLLOW MANUFACTURER'S INSTRUCTIONBAND
<br />SPECIFICATIONS. FRP IS LAMINATED TO 1/2" ORIENTATED STRAND
<br />BOARD (OS 13; AND IS NFS AND USDA APPROVED.
<br />4.1 PANF S SI IAI I far STORF f) OKI A f AT DRY S01 ID SIJRrArF.
<br />4.2 LAY HORIZON IAL AI LEAS 1 24 HULPHS PRIOR 1 DINS I ALLA I ION.
<br />4.3 ACC IMATF TO ROOM TFMPFRATIJRF AND I I(1MIDITY.
<br />4.4 ALLOW MINIMUM 1/8" EXPANSION CAP BETWEEN PANELS AND
<br />M[ I FANGS.
<br />4.5 VINYL MOLDINGS AVAILABLE; INSIDE CORNER, DIVIDER STRIPS, END
<br />CAPS, AND OUTSIDE CORNERS.
<br />4.5 APPLY SILICONE SEALANT BETWEEN MOLDINGS AND PANEL.
<br />4.7 PROPER ADHESIVE REQUIRED ON ALL SUB SURFACES THAT PANELS
<br />APPLY TOO.
<br />4.8 INSURE THAT ALL WALL SURFACES AND STUDS ARE CLEAN, DRY,
<br />SMOOTH. LEVEL. STRAIGHTAND PLUMB.
<br />4.9 ALL SUB - SURFACES JOINTS TO BE STAGGERED JOINTS VV/FRP
<br />COVERINGS.
<br />4,10 NOTICE: DIVIDER MOLDINGS NEED TO BE TRIMMED 3 FT, ABOVE
<br />FLOOR IN KITCHEN ONLY AT THE 14 FT. EXHAUST HOOD AREA.
<br />TO ALLOW FOR THE 18 "xTx7'x18" S/S PANELS TO BE BOLTED
<br />AGAINST WALL.
<br />4,11 ALL MOLDINGS NEED 10 BE I RIMMED 10 ALLOW t_�EILI"G (_�HAIANEL,
<br />FI OOR RA IF, SINKS, TRIM, BACK SPI ASI IFf) AND ANY 071 IFR
<br />I EMti 10 LAY FLA I AGAINS I WALL PANEL.
<br />5 CEILING WIRE SUPPORTS: DO NOT INSTALL CEILING WIRE SUPPORT
<br />AT AREAS OF EQUIPMENT OR SERVICE DOORS,
<br />6 SEAL FLOOR AT WALK -INS PRIOR TO INSTALLING WALL BASE,
<br />7 MOP FLOOR BASIN TO BE INSTALLED ON TOP OF TILE AND CAULKED.
<br />8 CONTRACTOR IS TO SUPPLY & INSTALL TWO COATS OF OF CLEAR
<br />SEALER IN UTILITY ROOM (ONLY). {USE SOY SEAL MAN UF.
<br />A P P LICATI ONANIS TALLATIONI SPECIFICATIONS.)
<br />9 CLASS "C" FIRE RATED, ( SPREAD 200 OR LESS, SMOKE
<br />DEVELOPED 450 OR LESS, GLASBORD -P.
<br />10 SAW CUTS TO BE CLEANED AND READY FOR FILL.
<br />C rack Isolation Specification
<br />SURFACE PREPARATION: MUST BE CLEANED OF ALL DUST & DEBRIS, AND
<br />STRIPPE❑ OF ANY SEALERS, WAXES; OR OTHER BOND BREAKERS"
<br />FRAMING: KAWNEER
<br />4511 THERMALLY
<br />BROKEN ALU MINUM
<br />WITI 1 #40 DARK BRO
<br />A"OLAZEL) FINISH
<br />O
<br />aC
<br />M
<br />Window Frame Elevations
<br />[ ' r ,.. 0 „
<br />Level
<br />1/4" = 1
<br />General Notes
<br />1. SEC SI ICCT A -181 FOR FLOOR FLAN.
<br />2, SCE SHEEI A -1'11 FOR REFLEC:I EU C:EILING FLAN AND UEILI14G HEIGH I
<br />DIMENSIONS AND CEILING MATERIAL LOCATIONS.
<br />3. SEE MECHANICAL AND ELECTRICAL SHEETS FOR RELATED WORK.
<br />4. THERMASTRUCTURE INSULATED CODLERfFREEZER PANELS HAVE BEEN
<br />TESTED AND ARE IN COMPLIANCE WITH THE APPLICABLE REQUIREMENTS
<br />OF THE FOLLOWING CRITERIA: NF PA r8fi 27�'�fi EDITION AND IBC 8[k"i.2.1 2089
<br />EDITION.
<br />Finish Materials Legend
<br />Floors
<br />CT1 CERAMIC TILE: 18" x 18" DALTILE ALTA VISTA AV -53 (DRIFTWOOD). THIN SET
<br />INSTALLATION, ON CRACK ISOLATION BARRIER, SEE SPECIFICATION THIS
<br />SHEET. 1/4" GROUT JOINTS. GROUT: MAP EI -COLOR 43 1MOCHA)
<br />Base
<br />RS RUBBED BASE: 4" H. x 1/8" BLACK W/ I OE
<br />CT3 8 CERAMIC COVE EASE
<br />Walls
<br />P PAINT: FINISH ALL WALL JOINTS AND PATCH ALL SURFACE IRREGULARITIES
<br />10 AC:HEIVE A LEVEL-5 L;URFACfE FINISH; AP'P'LY A PRIME C 0 I AND I WO [2]
<br />FINIS I I (:G )ATS, SMOOTI I FINISI I OR AS SPFG:IFIF BY C'A SIFY'S, C01 OFZ:
<br />SHF RWIN WII 1 TAMS fC:UST[ }M ( - ,01 OR FORMIJI A MATCH}
<br />- INTERIOR
<br />- EGGSHELL
<br />- EXTRA WHITE TINT BASE
<br />- 1 GALLON FORMULA
<br />CCE CulcrCast Ec owner OZ 32 64 128
<br />B1 Blar;k D 12 1 4
<br />R2 Marour 0 6 1 0
<br />Y3 Dark GAd D 55 1 1
<br />FRP FIB ERGLAS5 REINFORCED PLASTIC ; WHI 1 E PANEL LAMINA 1 ED I D 1 /2"
<br />ORIFNTATED STRAND BOARD (OSf3) MFG RY Kr VII I Tr, NAII TOP AND
<br />BOTTOM ONLY DURING INSTALLATION. NFS/USDA APPROVED
<br />CT2 CERAMIC WALL TILE 12" x 12" DALTILE ALTA VISTA AV -53 (DRIFTWOOD),
<br />AND ONE [1] ACCENT COLOR (AV�51) (SUNSET GOLD), DIAMOND SET, 1i4"
<br />GROUT JOINTS. GROUT: MAPEI - COLOR 43 (MOCHA. INSTALL OVER
<br />GB - WET USG FIBERDCK AQUA - TOUGH SEE INTERIOR WALL ELEVATIONS
<br />SHEET A FOR ADDITIONAL INFORMATION REGARDING LIMITS OF
<br />INSTALLATION
<br />MAP CI EPDXY GROUT TO BE USED ON MEN'S RESTROOM FLOOR AND
<br />URINAL WALLS. MAPCI EPDXY KIT #9999623831
<br />Wall Materials
<br />GB WET: USG FIBERDCK BRAND AQUA -TOUGH INTERIOR PANEL, MOISTURE AND
<br />MOLD RESISTANT, 5i8" CORE THICKNESS, FOR USE AS BACKING FOR PAINT FINISH
<br />WALLS & CERAMIC TILE. FINISHED PAINTED WALL TEXTURE TO BE SMOOTH.
<br />0SI3: Kr M1 ITr I AMINATrf) FRP TD 1/7" OSR S01 STRATI (KrMPI Y INSTAI I AND
<br />FINI PEP, MANUFAG I URERS WRI I I EN INS I HU(; I IONS- SEE FRP WALL FINISH
<br />FOR MORIF INFC)RMATI(_)N,
<br />Room Finish Schedule Notes
<br />Floors
<br />F1 RAISED PLATFORM: BUIL❑ W/ 2x5 NOM FRAMING W/ 3/4" PLY WD SUB - FLOOR,
<br />INSTALL 1/4" THIN SET, 1/2" DURAROCK UNDERLAYMENT THEN 3/8" CERAMIC
<br />WITI 1 1/4" TI IIN SET.
<br />FZ MANUFACTURED FLOOR: 114S LA 1 EU ME I AL FLOORS SUP'P'LIED BY 1-- F2EEZEH
<br />FCDLIIPMFNIT MAN IJFACTIJRFR, NCB OTHER FINISH RFQLIIRFf7 THISARFA
<br />Base
<br />kit WALL/FLOOR JUNCTION FREEZERS ONLY -METAL COVE INTEGRATED INTO
<br />METAL FLOOR !014E PIECE) SUPPLIED BY FREEZER MANUFACTURER, SEALANT
<br />(CAULK) INSIDE COVE TO WALL JUNCTION.
<br />Wa lls
<br />1 COOLER/FREEZER FACE PANELS: USE FIBEROCK AQUA -TOUGH PANEL ON
<br />FACING OF COOLERiFREEZER IN SALES AREA.
<br />� PARTIAL WALL: SALES COUNTER BACK WALL IS A PARTIAL HEIGHT WALL
<br />(5' -2" A.F.F)
<br />GOMPOSIT PANEL: F- HP WALL FINISH IS FACs 10 RY LAMINAI ED IO 1/2" OS WALL
<br />PANT S. CONTRACTOR TO FINISI I AI I JOINTS AND MAKF Al 1 FIF1 D CUTS
<br />ACCORDING I O MA AUFAU I URERS WRI I I EN INS I ALLA I ION INS I HUC.1 IONS.
<br />�N4 PROVIDE FIBEROCK AQUA -TOUGH PANELS FOR TILE BACKING & PAINT FINISH.
<br />General Remarks
<br />NON -COMBUSTIBLE WALL: INSTALL STEEL STUDS WITH 518" AQUA TOUGH TO
<br />INTERIOR SIDE OF THE KITCHEN WALL, HEIGHT - 9' - C- ", ALL FRP COVERINGS
<br />WILL BE CUT TO FIT NEXT TO S/S PANELS AROUND KITCHEN HOOD AREA.
<br />SCHE❑
<br />SOLID CORE
<br />WOOD DOOR
<br />O
<br />Glazing Key - All Windows
<br />♦ ♦ 1" BRONZE TINTED INSULATED TEMPERED
<br />GLASS WITH LOW-E COATING ON THE #3
<br />71 .SURFACE.
<br />
|