My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/27/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 01/27/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:27 PM
Creation date
1/23/2015 8:30:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/27/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
734
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August <br />July <br />November <br />Fire Station #2 <br />Project Timeline <br />2006 Space Needs Analysis <br />The purpose of this step was to answer a number of questions regarding the existing Fire Station #2 site; <br />and to identify Fire Department space needs. For example, does the existing old municipal center site work <br />for Fire Station #2? Can we renovate the old municipal center building? Should we demolish and rebuild a <br />new fire station? Attached is a Fire Station #2 Feasibility Report and Space Needs Analysis for the old <br />municipal center site (existing location of Fire Station #2). This work was completed by BKV Group. In 2006, <br />it was determined, utilizing the existing municipal center site was not a feasible or practical long term <br />solution. At that time, a new Fire Station #2 site was identified and proposed --5650 Alpine Drive NW. <br />2012 Surplus City Owned Land <br />In 2012, the City Council identified the old municipal center site surplus City owned property; and <br />provided Staff with direction to identify opportunities to return this property back to the private sector. As <br />part of that discussion, the current location of Fire Station #2 was identified as a factor in the future <br />development of the old municipal center site. In order to allow for future development of the old municipal <br />center site, a new location for Fire Station #2 would need to be planned/prepared in order to <br />effectively react to future development. <br />2013 Schematic Design <br />The purpose of this stage is to develop schematic designs of what Fire Station #2 could look like (often <br />referred to as preliminary design). The outcome of this stage is preliminary architectural designs and <br />preliminary site plan documents. Additionally, a preliminary project budget is developed. This work was <br />authorized by the Council on November 26, 2013. Construction costs were estimated at $3,230,000 and <br />soft costs are estimated at $509,500 ($3,739,500 sub total). If the City bonded for this project, the total <br />bond issue would be estimated just above $4M (total estimated project costs). <br />Sep. 2013 - Feb. 2014 <br />August <br />Collaborative Public Input Process on Landuse of Former OMC Site <br />The City undertook a process to consider the future development of the "Old Municipal Center Site." This <br />collaborative 13 -citizen -member public input process was known as the "Old Municipal Center Study <br />Group." The City considered two general development scenarios for the 21.5 acre site: (A) data center <br />development and (B) residential development. Previously, the Old Municipal Center Site was zoned <br />Public/Quasi Public. The City Council decided to move forward with an amendment to allow for single- <br />family residential only land use on the OMC site. <br />2014 Final Design & Specifications <br />The purpose of this stage is to develop final site plans, architectural plans, civil plans, landscaping plans, <br />electric/mechanical plans, construction specifications and bid documents. By completing this step, the City <br />would be in position to move forward with constructing Fire Station #2 in a quick and effective manner. This <br />work does have a shelf life of approximately five years. Construction costs were estimated at $3,339,500 <br />and soft costs are estimated at $461,000 ($3,851,000 sub total). If the City bonded for this project, the total <br />bond issue would be estimated at $4.15M (total estimated project costs). <br />January 08 2015 <br />January 13 2015 <br />January 27 <br />February 12 <br />February 24 <br />March 12 <br />March 24 <br />March <br />Public Open House <br />City Council Update: Review Final Design & Updated Budget <br />City Council: Consider Approving Site Plan Application (separate case) <br />2015 City Council: Consider Authorizing Letting Bid <br />2015 Bids Docs 100% Complete, Let Bids <br />2015 Pre -Bid Meeting <br />2015 Bids Due and Tabulated <br />2015 City Council: Consider Accepting Bids & Awarding Contract <br />2016 Project Completed <br />
The URL can be used to link to this page
Your browser does not support the video tag.