improvements, and that Elk River will pay for Ramsey's share of the costs up -front while allowing repayment over <br />a three-year period. Staff has since verified that repayment would be allowed to occur interest-free over calendar <br />years 2016 to 2018, which would not impact the City's adopted 2015 budget. <br />On September 16th, 2014 staff presented Elk River's proposal to the Public Works Committee for consideration of <br />recommending Council approval of the project, pending further direction from Elk River. It was discussed that <br />though the railroad crossing is located entirely within the City of Elk River, City of Ramsey businesses and <br />residents would share the benefit of the quiet zone so Elk River's request to share in 50% of the costs seems <br />reasonable. It was also discussed that Elk River proposed to reconstruct Jarvis Street as a 9 -ton road with <br />bituminous pavement and concrete curb and gutter at a width of 32 -feet, which appears to be reasonable <br />considering that Jarvis Street is a Municipal State Aid route, and that the concrete curb and gutter will help protect <br />the pavement edges and extend the life of the pavement. It was also discussed that a 10 -foot wide off-road <br />bituminous trail was proposed west of Jarvis Street to connect the City of Ramsey's Mississippi River Trail, which <br />is to be constructed on the south side of Highway 10, to Elk River's section of the Mississippi River Trail, which is <br />proposed to be routed through the City of Elk River (not along Highway 10). Based on all of the proposed <br />improvements, and assuming a 50/50 cost split, the City of Ramsey's total cost -share amount was estimated to be <br />$970,728. The Public Works Committee recommended Council approval of Elk River's proposal using a 50/50 <br />cost split and three-year payback allowance beginning in calendar year 2016. <br />On October 20th, 2014, the Elk River City Council reviewed the Feasibility Report for the City of Elk River's 2015 <br />Street and Utility Improvements project, which included the 32 -foot wide street design with 10 -foot wide off-road <br />bike trail. At that time, the Elk River City Council directed their staff to redesign Jarvis Street to a 36 -foot wide <br />street with two 12 -foot wide through lanes and two 6 -foot wide on -road bike lanes and no off-road trail. <br />In January of 2015, Elk River provided the attached City Council case and Feasibility Report to Ramsey City staff, <br />along with the attached memo from their consulting engineer Bolton-Menk, Inc, (BMI) dated October 29th, 2014 <br />addressing the revised design and estimated project costs. Based on the BMI memo, as well as the attached 2 -page <br />cost estimate that adjusts the estimated costs for the old 32 -foot wide street design to the revised 36 -foot wide <br />design, the City of Ramsey's total share of the project costs decreased by $50,422.50 resulting in a total estimated <br />cost -share of $920,305.50. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Observations: <br />In 2014, City of Ramsey staff rated this section of Jarvis Street with a PASER rating of 2 which warrants a total <br />reconstruction. While this is not the worst street in the City of Ramsey, it ranks quite close and as such is included <br />in the City's 5 -year CIP for street reconstruction projects. <br />Though the adjacent property uses are different on either side of the shared section of Jarvis Street, with industrial <br />properties in Elk River and residential properties in Ramsey, Jarvis Street is designated as a Municipal State Aid <br />Street by both cities and as such must be reconstructed to State Aid standards as proposed by Elk River. <br />Reconstructing this section of Jarvis Street at the same time as the reconstruction of Andie Street and/or 164th Lane <br />in 2016 and/or 2017 as shown in the current CIP would not be a good option as access to 164th Lane would be <br />required from Jarvis Street from time to time. Therefore, reconstructing Jarvis Street in 2015 fits well with our <br />scheduled road reconstruction projects. <br />Ordering a Feasibility Report will allow staff to further explore funding options for the proposed improvements, <br />including the use of special assessments to benefiting properties. At this time, staff anticipates presenting the <br />Feasibility Report to the City Council on February 10 th, 2015. If special assessments are utilized, the Chapter 429 <br />public process will need to proceed as quickly as possible to allow the project to move forward in 2015 as currently <br />proposed by Elk River. <br />