Laserfiche WebLink
Review File: Casey's General Store (7222 Sunwood Dr NW) <br />Site Plan Review: Comprehensive Plan and Zoning Code <br />January 2, 2015 <br />Page 3 of 4 <br />Parking: The Site Plan indicates eighteen (18) parking stalls in addition to sixteen spaces for fuel pumping within the fuel pump <br />island. Parking Stalls in front of the trash enclosure do not need to be marked/striped unless desired by the Owner. The Site <br />Plan appears to have more than adequate parking, and may be slightly reduced if desired by the Owner. <br />Signs. The Site Plan includes a plan for permanent signage to include two (2) permanent ground signs (one [1] per road frontage) <br />and several wall/fuel pump island signs. The COR places a high degree of focus of sign design as to not detract from the high <br />quality of architecture of buildings. The City often utilizes the Conditional Use Permit process to allow the Planning Commission <br />and City Council the opportunity to review sign plans parallel to site plan review, as opposed to a Staff administrative review. <br />Due to the size of the two (2) ground signs, a Conditional Use Permit is required to be issued. <br />The existing real estate contract between the City (current owner/seller) and Casey's Retail Company, LLC (buyer) includes a <br />contingency that the City shall approve two (2) ground signs, but does not include any other detail about size or design. Final <br />design and review of permanent signs must be in accordance with City Code. Please also note City regulations regarding <br />temporary signs for future consideration. <br />Landscape and Streetscape Plan. The Site Plan is devoid of a full Landscape Plan as required for Site Plan Review and <br />outlined in the application packet. The Landscape Plan must include planting locations and planting detail of trees and shrubs <br />within the streetscape section for Sunwood Drive as outlined in the approved Real Estate Contract. Additionally, the Landscape <br />Plan must include details on sidewalk construction to ensure consistency in design with the remainder of the Sunwood Drive. <br />These details include, but are not limited to, sidewalk scoring and brushing, perimeter pavers in planting beds, and style of mulch <br />utilized, as these improvements will be within City right of way. <br />Please submit the required Landscape Plan for review. This plan must be submitted and reviewed by City Staff before the request <br />is submitted to the City Council to consider final approval. <br />The City would desire that a temporary bituminous trail be constructed from the entrance to Casey's General Store to the <br />intersection of Sunwood Drive and Peridot Street. This use is likely to become a destination for adjacent residential, commercial, <br />and institutional uses within walking distance of the development. As a primary focus of The COR is pedestrian safety, it will <br />be important to provide pedestrian crossings at safe locations, rather than unmarked, mid -block connections across multiple <br />lanes of traffic. The temporary section of the trail does not need to meet the minimum streetscape standards, as ultimate <br />development of the vacant parcel is not yet known. <br />Please revise the Site Plan to address the comments above. <br />The City would like to have a discussion on the ultimate maintenance responsibility of the landscaping within the streetscape. <br />The City would like to discuss if Casey's General Store is willing to assist the City in maintaining this landscaping and trash <br />receptacles long-term as part of the regular operations of Casey's General Store, as a well maintained streetscape will improve <br />the aesthetics of Casey's General Store. The City is flexible on this discussion topic. <br />Recommendation. City Staff does recommend approval of the request, with amendments as outlined in this file. Please see the <br />Planning Commission Agenda Item for specific actions being taken for approval. <br />Next Steps. Following Planning Commission Review, the Site Plan will be forwarded to City Council for consideration. Before <br />the request is scheduled for review by the City Council, many of the items noted above must be addressed. Please contact me <br />to set up a time to review which items shall be completed prior to review by the City Council. <br />There are multiple site plan and real estate related items that shall be addressed prior to closing. <br />