Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> i <br /> I <br /> I <br /> ! <br /> I <br /> ! <br /> I <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> <br /> iTh~ proposed South 70 landfill operation will not be <br />connected~wi~h the present facility, but will be constructed as a <br /> <br />will be the ~tate of the art planning in construction and opera- <br /> <br />tion of i~ m xed municipal solid waste landfill. No hazardous <br />waste wilL~ b~ disposed of at the landfill. (See Plans, Section <br />II.) Th ime cures to be considered in so constructing a sanitary <br />landfill;are!litter control, dust control, odor control, vector <br />control, fir~ control, the protection of ground water and surface <br />water thr~ug~ the use of surface water diversion and retention <br />and leaChateI collection systems, monitoring and collection of <br />methane ~s, ithe minimization of noise, the control of windborne <br />and water'erie erosion, the monitoring and prevention of ground <br />water p°i~ut~on, soil cover and revegetation, closure and post- <br />closure care~ and end use planning. (See Plans; June 25, 1984 <br />testimony iof iHenry Koch.) <br /> <br /> ~ ~?~-~-~ ~ ...... £__~ _3_~ ~ .... <br />tion, a~dlJ t~e creation of noise, odors, and dust describe <br />elsewhere ;i inI these Findings, the Commission finds that th~ <br />operation :icl !a landfill would be detrimental to or endanger th~ <br /> <br /> ~oi!se Control. ~s a part of the design criteria, <br />construction iberms will be erected during the filling phase of <br />the landfil~ioperation in order to deflect the sounds of con- <br />struction~ian~ disposal equipment upward and away from the homes <br />in the vio!in~ty of the South 70 expansion. Muffling devices and <br />deflecto~s will also be placed upon construction and operation <br /> <br /> <br />