Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />i <br />I <br />I <br />I <br /> I <br /> I <br /> <br />waste water ~reatment facility. <br /> <br />O' Conner) ~ <br /> <br />(July 3, 1984 testimony of James <br /> <br />Adequate access roads, on-site parking, on-site <br />10adin9 and u~loadin9 have been or will be provid- <br />ed. [170.016E Criteria for Approval]. <br /> <br /> 26. ~Th~ current access road into the site is a bituminous <br />surfaced :al~-weather road. (Plans, Section III C.) As the <br />findings Of Ithe Metropolitan Council point out, access to the <br />site is g°odl and no road upgrading would be required. (Metro <br />Council Re. so}ution,"'- Resolution 2.G.) In the event that substan- <br />tial inc~reas~d traffic were generated by the construction and <br />operatiorl o~ the environmental improvement or the South 7 0 <br />expansi°n,il i~gress and egress traffic lanes could be provided to <br /> <br />accommodate ~he additional volume. <br />Donald Ot~ter.~) <br /> <br />Tt~is <br /> <br />(July 3, 1984 Testimony of <br /> <br />Adeqqate measures have been taken to provide <br />ingress and egress so designed as to minimize <br />traffic congestion on public roads. [170.016E <br />Criteria for Approval]. <br /> <br />criterion is addressed elsewhere in these <br /> <br />Findings <br /> <br />is <br /> <br /> 28. Exc <br /> { <br />specifically <br /> <br />The use will conform to all applicable regulations <br />of the district wherein proposed. [170.016E <br />Criteria for Approval]. <br /> <br />ept for the portion of the landfill operation that <br /> <br />covered by and utilized pursuant to the <br /> <br />26 <br /> <br /> <br />