Laserfiche WebLink
· ! ! Increase <br /> ~ ~ :i ! In Contract Prise <br /> I 1. (~ang~ the al~gmm_nt of the <br /> sub~un~ sewer between Manholes <br /> <br /> 2, 6~i7 & 15. 0 <br /> <br /> 2. Lcw~r! the propsoed street g~ade <br />I on Wa.~o ~treet beb~een Station <br /> 19 ~ 28 and on 147th Circle ~ <br /> and !r.~vi$'e the l~ole builds as <br /> <br /> 3. i~rli th~ watermatn on Waoo Street <br /> be~en.~tations 19& 28 and on <br /> 147~, C~cle Ng as sh~n on plan <br /> she~ ~ o <br /> 18 & 20. <br /> <br /> 4. I.~~ th~ storm s~er on ~aco Street <br /> be~ en 8rations 15 & 22 as shc~n <br />I on plan~' ~eet ,~ 27. 0 <br /> <br /> 5. Addi ."i40 ~inear feet of 10" ductile <br /> ir~ Ipi~e~r watermain and a 10" tee <br />I as ~i~ on plan sheets 2 & 15 at <br /> $14~.Ii5 ~er linear foot of pipe and <br /> $255 <br /> <br />I 6. ~ ~o ihydrants an4 six i.ch valves <br /> al~ n~e trunk wats.rmain as sh(~m <br /> on !p~.an{sheet 15 at $285 per valve <br />I ~ ,~81~ pe, hyd,ant. <br /> <br />I 7.grat~.~e~151 of 15" RCPClass III st°tm <br />· a~d a 15" flared end with a <br /> b~tween Lots 13 & 14, Block 5 <br /> aslS~o~ on plan sheet 27 at $19.90 <br />I per,in, ar foot of pipe and $350 for <br /> t~e :~iated ~. <br />· 8. Re~i~ ~he street grades at 149th <br /> Av~e ~ its intersection with <br /> ¥~f~a St. & Ska~o St. as sheen <br /> ~.~. ~ets 12, 13, 21, 22, 23, <br />I 26~r~ 28I. o <br /> <br />PleaS~, <br />files ~ <br /> <br /> Increase <br />In Contract Price <br /> <br />, $5,032.00 <br /> <br />$2,190.00 <br /> <br />$2,638.50 <br /> <br />0 <br /> <br />$9,860.50 <br />$9,860.50 <br /> <br /> Totals 0 <br /> <br /> , Net (~ange In Contract Price - <br /> <br />:el e~ to River's Bend Construct. ion Project %84-12 and %84-18 project <br /> ~ange order %1. <br /> <br /> Page 19 of 20 <br /> <br /> <br />