|
'1
<br /> I
<br /> I
<br /> i
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br />I
<br />I
<br />I
<br />
<br />10.
<br />
<br />Eslim,'lled f--'osts, h is understood and agreed that construction cost amounts set forth in
<br />till.,, Agreement as ~t:tge 1 an3 Stage I1 Improvements, unless specified as fixed amounts.
<br />arc estimated. The DEVELOPEI{ agrees to pa)' thc enUre cosl of said improvements
<br />including interest, fiscal engineering and legal charges.
<br />
<br />II,
<br />
<br />STAGE II IMPROVEMENTS AND FINANCIAL GUARANTEES:
<br />
<br />SIreet.:Cleanin,r,. From time to time, the CITY ma.,,' remove accumulations of soil, earth
<br />and debris ifrom the streets resulting from the construction of the Plat. It shall be the
<br />DEVELOPER'S responsibiliLv to pa)' the. costs associated with this necessary street
<br />cleaning. Invoices from the CITY to DEVELOPER for such costs shall be paid within
<br />fifteen (15) days of the date of invoice.
<br />
<br />~lreet/Traffic Signs. Slree! Lit, hts and Seal Coating. The CITY will install in
<br />the Plat, as Stage I1 Improvements, street/traffic Signs and sealcoating. The
<br />DEVELOPER will pa.',' to the CITY an amount eaual to 100% of the City Engineer's
<br />estimated construction cost of the items prior to recording of the final Plat. The
<br />DEVELOiPER shall also deposit an amount that is determined by the CITY to be
<br />adeouate to' aid in the operation and maintenance of street lights in locations demrmined by
<br />the City Engineer and installed m' Anoka Eiectn: Cooperative for the first three (3) 3,ears.
<br />'The CITY'will bill residents in the Plat ar least quarterly for street light maintenance and
<br />operation costs: billings wil! be initiated a.: the time of connection to municipal water and
<br />
<br />sanitary sewer. The cost o? mese items
<br /> Street Clewing
<br /> Sealco~fing
<br /> Two (2) Street Signs
<br /> Two r'~s -
<br /> Four ~'41 S~e~t
<br />
<br />5300.00
<br />52,000.00
<br />240.00
<br />240.00
<br />1.600.00
<br />i.080.00
<br />
<br />S5.460.00
<br />
<br />Har~l iSugt'.aeed Drivev,'avs and Sodded Boulevards. Hard surfaced driveways
<br /> ~ · ~ , ' ~' -' -/or each ior ~n the Pia:. Said imorovemenrs shal2
<br />,,md Sodded bouievm-ds ar~ a, ~amr~m~n,
<br />be installed ~x' me ~uiiding Den-m: appiican.: or me homeowner at me nme me Cerd'ficate of
<br />OzzuDan:'v is issued or :2.,.~ soon -;"~-o,,,_,~a,,~.';,-'- a~ ~ossibie. weather~,,'-m, ~tnn,.. -' ' ' _= In the ,:.~x,-.~n,
<br />~ ............................... ',~' ~i; : oi~
<br />:nest ,,-,,-,-rix ...... ~ are ":" -;-.-,-~v ~,,s--~:~s ,~ DEVELOPER. on o.n,._ o.
<br />
<br />
<br />
|