My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/25/1992
Ramsey
>
Public
>
Agendas
>
Council
>
1992
>
Agenda - Council - 08/25/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:02:13 AM
Creation date
2/25/2004 10:17:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/25/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br /> <br /> REPAIR OF CENTRAL PARK IRRIGATION PUMP <br /> By: Mark Boos, Parks/Utilities Coordinator <br /> <br />Background: <br /> <br />On August 10, 1992, a City employee allowed a subcontractor to ASTECH Corporation (the <br />contractor awarde~t our 1992 Sealcoating Program) access to the water supplied from the Central <br />Park well t° fill tile tank in the street sweeper which was being used to remove excess aggregate <br />from the seal~oat~4:l streets. The valving from the well is enclosed in a secured fenced area. The <br />City employee instructed the sweeper operator to close the valve from which he was drawing water <br />and lock the enclosure after his use was completed. The sweeper operator closed the specified <br />valve, but in addition also closed the main valve to the irrigation system which was located within <br />this same enclosurg. When the preset timing for the irrigation system was activated, the irrigation <br />pump and motor attempted to pump against a closed valve. The pump and motor have been pulled <br />from the wall and! assessment of the damage by E.H. Rennet Well, Inc. is between $6,000 and <br />$7,000. <br /> <br />There is an .immediate need for repair of the pump since irrigation is necessary through mid- <br />October whCn'~ the ~occer season ends. The City's position is that the cost of the repair should be <br />the responsibility o~ the street sweeping contractor. <br /> <br />Recommendation: <br /> <br />Staff recommends that Council authorize the immediate repair of the Central Park irrigation pump. <br /> <br />Staff further recommends that the retainage fi.om ASTECH Corporation payment be increased fi.om <br />$4,296.17 to $t0,000 to cover the cost of this pump repair. <br /> <br />Council Action: <br /> <br />Motion to authorize the immediate repair of the Central Park irrigation pump. <br /> <br />Motion to increase retainage from ASTECH Corporation from $4,296.17 to $10,000 to cover the <br />cost of the pump repair. <br /> <br />Reviewed By: <br /> <br />Parks/Utilities Coordinator <br />City Engineer <br />Finance Officer : <br />City Administrator <br /> <br />CC:08-25-92 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.