Laserfiche WebLink
§ 4.40 <br /> <br />Water and Sewer Utilities <br /> <br />4.40~20 Opening Hydr-,~ts. No person, except authorized City employees or a <br />member of the Fire Department in case of fire, shall be allowed to open any fire <br />hydrant in the water system for any purpose whatsoever, without first securing <br />authorization from the City. <br /> <br />4.40.21 Variances. The Council may permit variances from the strict <br />appliance of any of the provisions of this section if it is satisfied that there are <br />special circumstances or conditions affecting the premises for which the variance <br />is requested and that the granting of such variance will not materially affect <br />adversely health, safety or general welfare or public or private property. Any <br />variation permitted under this provision must be noted on the permit. <br /> <br />4.50 <br /> <br />4.50.01 <br /> <br />Ramsefs Financing Policy. <br /> <br />Streets <br /> <br />Subdivk~on L In k'~i~,g Platted Areas <br />a. M.S.A. Street <br /> <br /> 1. Assess the cost of 50% of a typical residential street (normal <br /> construction) on a unit method or front foot basis. For the <br /> purpose of this paragraph, the cost of a "typical residential <br /> street" shall be defined as the cost determined annually <br /> based on the construction costs during that year for each type <br /> of street constructed to current City Standards. <br /> 2. Remainder of cost is paid by M.S.A. <br />b. Residential Street <br /> <br /> 1. Assess the total cost o£ initial construction on a unit method <br /> or front foot basis. <br /> <br />2. Assess 50% of the cost for reconstruction/overlays on e:dsting <br /> bit~r~nous street with the remaining 50% being assessed to <br /> the Cit~,. <br /> <br />3. On MSA streets which provide access to residential lots, <br /> assess those lots 50% of the cost for the <br /> reconstruction/overlays for a typicaJ residential street with <br /> the remaining cost being paid by MSA funds. <br /> <br /> In New Developments <br /> <br />Assess total cost on a unit method <br /> <br />Sub& <br /> <br />SubcL & Seal Coa~ng <br /> <br />a. Assess total cost on a front foot <br /> sea]coating on City streets. <br /> <br />or unit basis for the initial <br /> <br />Printed 12/25/90 <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> <br />