Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> FINAL QUANTITY <br />CHANGE ORDER #1 <br /> <br />July 7, 1992 <br /> <br />Honorable Mayor and City Council <br />City of Rarnl~eq [ <br />15153 NOwthcn B~vd. N.W. <br />Ramsey, MN ~55303 <br /> <br />RE: ImprO~feme~nt Project ~)0-30, Parabody Landscape Improvements <br /> Contra~tor:l Noble Nursery, Inc., 12550 - 129th Ave. N., Dayton, MN 55327 <br /> <br />Item gl: i Th0 contractor has submitted a request to be reimbursed for 3,025 sq. yds. of sod. <br /> iTh~ estimated quantity called for 1,530 sq. yds. of sod, therefore an additional <br /> il,495 sq. yds. was placed at a cost of $1.45 per sq. yd. An additional cost of <br /> i$2,!67.75 is proposed as full compensation for the additional sod placed. <br /> <br />Item #2: i Eigbty (80) tons of Bryan Red Rock mulch was placed instead of 90 tons as called <br /> ifor in the estimated quantity. A deduction of ten tons at a cost of $18.00 per ton or <br /> i$18D.00 is proposed. <br /> <br />Item #3: !509! sq. yds of landscape fabric was placed instead of 551 sq. yds. as called for in <br /> rthO ~stimated quantity. A deduction of 42 sq. yds. at a cost of $1.00 per sq. yd. or <br /> !$42100 is proposed. <br /> <br />Item g4: ~217ilinear feet of poty edging was placed instead of 225 linear feet as called for in <br /> i the ~stimated quantity. A deduction of 8 linear feet at a cost of $1.00 per linear foot <br /> !or ~8.00 is proposed. <br /> <br />Item #5: <br /> <br />Item #6: <br /> <br />!Fo~ Sparkler Flowering Crabs and three Pink Spire Flowering Crabs were <br />iund~rsized plants. A 15% deduction on seven Flowering Crabs at a difference in <br />!eoS~ of $22.50 per crab tree or $157.50 is proposed. <br /> <br />~Fou~ Mugho Pines were smaller sized than specified. A deduction of $26.60 per <br />pm~ or $106.40 is proposed. <br /> <br />Original ConW4C. t Amount: <br />Plus Item gl .this C.hange Order: <br />Less Item #2fllis Change Order: <br />Less Item #3:~!s C~ange Order: <br />Less Item #4 this Crhange Order: <br />Less Item ~ ~is Claange Order: <br />Less Item #6 this Change Order: <br /> <br />$17,075.50 <br />2,167.75 <br />180.00 <br />42.00 <br />8.00 <br />157.50 <br />]06.40 <br />$18,749.35 <br /> <br /> <br />